- Trail:
- The Ridge (Don Valley)
- Status:
- Minor Issue / Yellow
-
Issue status:
- Condition:
- Unknown - please contribute condition
- Reporter Primary Activity:
- Mountain Bike
Description:
Note, trail is clear, but you cannot access Anything north, as the vehicle bridge is under construction. No access to Flats, Motown, Bunny, etc. you can enter Catalyst via Topo. This is now a very puckering line. We rode Catalyst as a loop coming south on Beaver Flats, then walking out past the construction workers and the guy let us through the gate back to Ridge.
Local Weather During Report
- Summary
Cloudy - Temperature
10° (9°/13°) - Precip
0 mm/h - Wind
8.02 km/h - Cloud Cover
95% - Humidity
0.78

Hopefully they'll let us through after work hours and on weekends.
This is a pretty unfortunate cutoff. The only way to access ET Seton from Cricket Tree is now: Go through the Overlea bridge and access through the Science Center connector (2.5km, no bike lane), go down Laird and access from Vanderhoof (4.6km, no bike lane) or backtrack all the way to Crothers and bike on the other side of the river (7.4km).