• Trail:
  • Seeley Pass (CAMBA Seeley Cluster)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Martell’s Pothole Blowdown: Lori and I were 90% through the rotten ~15” diameter blowdown (with the 15 “ Silky BigBoy back pack saw) when a group of seven(?) riders appeared. Our unlikely group of nine was able to roll the big log and clear the trail.
  • Work Report:
  • trail work done

  • 2 volunteer attendees
  • 0.4 volunteer hours
  • 2 total workers
  • 0.4 total work hours
Individual Workers:
Tom D.
hours: 0.2
paid: no
Lori D.
hours: 0.2
paid: no

Previous Reports

statusdatedescription
Aug 25, 2026 @ 9:58am
Aug 25, 2026
view
Jul 6, 2026 @ 5:33pm
Jul 6, 2026
Riding perfect, minimal undergrowth, one low hanging branch. view
May 2, 2026 @ 8:08am
May 2, 2026
view

0 Comments






Official Trail Reporter i

  • CAMBA Seeley Cluster
  • CAMBA Seeley
  • 0
  • Share with followers