• Trail:
  • Ravens Ridge (Tillamook State Forest)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Variable - some wet spots, or some dusty spots but overall good conditions
  • Reporter Primary Activity:
  • Mountain Bike
Description:
WTF Private work party: upper section above main road crossing, had vegetation cut back and upper section was raked about 80% of trail.

New berm placed at first switchback right hand corner following the very first road crossing. It helps aim riders down the trail after the first technical section. Packed in and ready to ride.

Trail is wet with some leaves. Trail was clear at 3:00 pm 11/08/2026 but variable weather can bring down branches so proceed with caution on first lap.
  • Work Report:
  • trail work done

  • 2 volunteer attendees
  • 14 volunteer hours
  • 2 total workers
  • 14.0 total work hours
Individual Workers:
Little-Yellow
hours: 7
paid: no
anonymous
hours: 7
paid: no

Local Weather During Report

  • Summary
    Cloudy
  • Temperature
    10° (10°/15°)
  • Precip
    0 mm/h
  • Wind
    3.33 km/h
  • Cloud Cover
    99%
  • Humidity
    0.92

Previous Reports

statusdatedescription
Nov 11, 2026 @ 6:06pm
3 days
WTF Private work party: reworked the drain on the new upper berm after the rain showed potential of an issue. The steep chicane in the middle of... view
Nov 9, 2026 @ 3:26pm
Nov 9, 2026
WTF Private work party: The lower left hand corner of the steep chicane half way down the upper section had become eroded exposing the logs that... view
Oct 24, 2026 @ 7:13am
Oct 24, 2026
WTF private work party: Basic maintenance in the clear cut. Everything from when you come out into the open to the lower parking lot was brushed... view

0 Comments






  • 0
  • Share with followers