- Trail:
- Jabbarocky (Rose Valley)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Dry -
- Reporter Primary Activity:
- Mountain Bike
Description:
Built a rock bridge over the down tree mid way down.
Still need to build a ride around at the second tree down.
Otherwise - beauty riding
Still need to build a ride around at the second tree down.
Otherwise - beauty riding
- Work Report:
- trail work done
- 1 volunteer attendees
- 1 volunteer hours
- 1 total workers
- 1.0 total work hours
Individual Workers:
