Trail Work History Report

Done by Darraj AlAhsa members and friends different communities.

- 17 / 02 / 2018 First draft of mapping using GPS (5.0km Long).
- 30 / 03 / 2018 Group Ride - Site Survey.
- 07 / 04 / 2018 Marking 1.9km (Placed ~35 flags and 3 arrows).
- 14 / 04 / 2018 Meeting - Site Survey (At the trails site).
- 27 / 04 / 2018 First group ride after marking 2.3km and Introduced changes to the trail.
- 05 / 05 / 2018 Group Ride with Darraj AlAhsa.
- 23 / 06 / 2018 Maintain the first 2.0km (Replaced all flags with new ones and added 5 new flags and 6 new arrows).
- 30 / 06 / 2018 Marking the remining 3.0km .
- 06 / 07 / 2018 Padyak Dammam MTB Group visit (Social ride).
- 21 / 07 / 2018 Maintained the first 3.50km (Placed 6 new arrows and relocated 2 flags).
- 26 / 07 / 2018 Second draft of mapping using GPS (5.23km Long).
- 30 / 09 / 2018 Third draft of mapping using GPS (5.32km Long).
  • trail work done
  • 26 volunteer hours
  • 15 attendees
  • 390 total work hours

Previous Reports

statusdatedescription
Aug 10, 2019 @ 1:04pm
Aug 10, 2019
Dry and loose. adjust your tyre pressure accordingly. view
Jun 14, 2019 @ 1:25am
Jun 14, 2019
Most arrows and red flags placed last summer to map the trail are no longer there. most of the trail is dry and clear. view
Jun 7, 2019 @ 9:49pm
Jun 7, 2019
Most arrows and red flags placed last summer to map the trail are no longer there. most of the trail is dry and clear. view

0 Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login