• Trail:
  • Old Head (W. Kerr Scott Reservoir)
  • Status:
  • Significant Issue / Amber
  • Issue status:
    Assigned user:
  • Condition:
  • Dry -
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Large tree down across trail, blocking trail in two places. (This spot is on both sides of the black pipe culvert.) The crown is blocking the trail severely and was more than I could manage alone with hand saw, needs a chainsaw. On the opposite side, the large hardwood root ball slid down hill directly on trail tread. It will take a few hours with a rogue hoe and shovel to cut a reroute above root ball.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 5 volunteer hours
  • 1 total workers
  • 5.0 total work hours
Individual Workers:
Singletrackbliss
hours: 5
paid: no

Previous Reports

statusdatedescription
Oct 25, 2026 @ 9:44am
Oct 25, 2026
log in trail on downhill but must look up right afterward as low clearance laurel has fallen further down. I hit my helmet hard. view
Nov 7, 2024 @ 9:15am
Nov 7, 2024
Trails Status (as of November 6, 2024) All trails are closed. view
Oct 23, 2024 @ 7:01pm
Oct 23, 2024
Warrior Creek is open with partial closure. See Kerr Scott FB page for updates view

1 Comment

  • + 1
 Sorry not sure why these photos won't geo tag on the map. It is where the black culvert pipe is located. There is also one Hickory tree down across the trail right above the rocky off camber section right near the lake. I cleared all the branches so you can get under it and it could be done with a handsaw but I was running out of daylight. Except for this spot I was able to get the entire trail cleared so it is now ridable.





Official Trail Reporter i

  • Piedmont Fat Tire Society - Regional Admin Group
  • PFTS Admin
  • 0
  • Share with followers