- Trail:
- Redline Prazeres (Calheta)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Dry -
- Reporter Primary Activity:
- Mountain Bike
Description:
After the fires of 2016 that destroyed the trail, at the end of 2016 it was rebuilt with a new 80% trail to meander the old trail, I do not know who it was that got, but here stays the thanks, trail is now very fluid and fast, In the jump of the road, can go by a rail that has in the road on the right side if you want something technical in the end, if you want, flow, go in front of the gap
- Work Report:
- trail work done
- 1 volunteer attendees