More Filters
datedescriptioncondition
Nov 2, 2025 @ 8:26am (America/New_York)
Nov 2, 2025
mtb Little leaf cover, riding great! Idealview
Sep 13, 2025 @ 10:33am (America/New_York)
Sep 13, 2025
mtb Trail trimmed, enjoy!
reporter
Dryview
Aug 23, 2025 @ 10:00am
Aug 23, 2025
ebike reporter Dryview
May 7, 2025 @ 5:44pm
May 7, 2025
mtb reporter Idealview
Apr 27, 2025 @ 9:07am
Apr 27, 2025
mtb reporter Idealview
Jul 28, 2024 @ 2:42am
Jul 28, 2024
mtb reporter Idealview
Jul 26, 2024 @ 3:51am
Jul 26, 2024
mtb reporter Idealview
Jul 22, 2024 @ 7:31am
Jul 22, 2024
mtb Trail cleared by Berks Trail Works
reporter
Variableview
Mar 13, 2024 @ 5:51pm
Mar 13, 2024
mtb several trees cleared by berks trail works
reporter
Idealview
Feb 1, 2024 @ 6:16pm
Feb 1, 2024
mtb Treefall cleared fr trail by BTW
reporter
Variableview
Jan 27, 2024 @ 3:52pm
Jan 27, 2024
mtb Trees down right after the intersection with the flow around. I took the flow around, I didn't get a great look if they were blocking the trail or not. Idealview
Nov 18, 2023 @ 2:58am
Nov 18, 2023
mtb Idealview
Feb 7, 2023 @ 1:42pm
Feb 7, 2023
mtb Tree fall cleared from lowest section of trail.
reporter
Variableview
Dec 13, 2022 @ 5:45am
Dec 13, 2022
mtb Final section of trail work completed. Fire road at entrance of trail was widened and built up. Eroded section after was filled back in with dirt and water bar created. Sandy right hand turn had more dirt added for more support from washing out.

Please consider staying off this section for a bit to allow it to setup.
reporter
Freeze/thaw Cycleview
Dec 4, 2022 @ 4:49am
Dec 4, 2022
mtb Small log cleared from upper portion of trail by Berks Trail Works/BCP volunteers
reporter
Wetview
Nov 13, 2022 @ 3:16pm
Nov 13, 2022
mtb Big hole at the bottom has been filled in. Roller water Bar built up just up from it.
reporter
Dryview
Aug 26, 2022 @ 12:18pm
Aug 26, 2022
mtb 3 water bar rollers with drains added between top wall drop sections. Eroded trail sections rehabbed with dirt and sloped to downside
reporter
Dryview
Aug 11, 2022 @ 5:08am
Aug 11, 2022
mtb Mud hole In turn after last wall drop has been completely re-worked. muck has been stripped, whole section cambered to shed water. 1 water bar/roller added, 2 natural drains, and a banked turn on the high side to keep riders from pushing off the trail.

Very last mud hole from last weeks work has been finished. we capped the turn with clay and steepened the turn a bit. sloped the whole section a bit more to keep the water from running straight down the trail.
reporter
Dryview
Aug 4, 2022 @ 10:49am
Aug 4, 2022
mtb Bottom turn has been filled and cambered to allow water to run off. Two parts of trail were shaved and filled for the same reason. Work by BTW members
reporter
Dryview
Jul 28, 2022 @ 6:06am
Jul 28, 2022
mtb Old water bar re-worked before crossing the double track at the wall drop. It's good to ride. Need to removed dead tree to put in proper drain yet.
reporter
Dryview
Jul 12, 2022 @ 6:52am
Jul 12, 2022
mtb reporter Dryview
Jun 19, 2022 @ 3:13pm
Jun 19, 2022
mtb Gaggle of tree fall cleared from trail by Berks Trail Works/Berks County Parks & Recreation Volunteer.
Enjoy!
reporter
Dryview
Jun 19, 2022 @ 4:46am
Jun 19, 2022
mtb Large tree down across trail, blocking trail reporter Dryview
Jun 19, 2022 @ 4:46am
Jun 19, 2022
mtb reporter Dryview
Mar 26, 2022 @ 8:39am
Mar 26, 2022
mtb Fun flow! Idealview