More Filters
datedescriptioncondition
Aug 21, 2026 @ 12:51pm (Pacific/Auckland)
Aug 20, 2026
mtb Idealview
Aug 18, 2026 @ 4:19pm (Pacific/Auckland)
Aug 17, 2026
mtb Idealview
May 18, 2026 @ 6:06pm (Pacific/Auckland)
May 17, 2026
mtb Everything in amazing conduction except one hole leading into the intermediate tabletop line Variableview
Apr 27, 2026 @ 9:39pm (Pacific/Auckland)
Apr 27, 2026
mtb Cleared debris and dug drains for lower gaps. Cleared upper starting platform, fixed up ramp and roll in. Rebuilt last two beginner table take offs. Filled holes.
Idealview
Mar 11, 2026 @ 8:33pm (Pacific/Auckland)
Mar 11, 2026
mtb Finished off 2nd gaps landing on lower set. Got the hose going onto a very dry landing.
Dryview
Mar 7, 2026 @ 8:08pm (Pacific/Auckland)
Mar 6, 2026
mtb Clearing drains, rocks and dust as well as foliage from the beginner table line.
Dryview

Login to view work report summary