More Filters
datedescriptioncondition
Nov 7, 2026 @ 1:55pm (America/Los_Angeles)
Nov 7, 2026
mtb Zone 2 trailwork completed. Line adjustments, including opening up drainage for the winter. Lower stepdown to step up jumps were rehabilitated to original specifications
Wetview
May 25, 2026 @ 8:34am (America/Los_Angeles)
May 25, 2026
mtb Wetview
May 3, 2026 @ 10:38am (America/Los_Angeles)
May 3, 2026
mtb Idealview
Mar 21, 2026 @ 1:14pm (America/Los_Angeles)
Mar 21, 2026
mtb Trail work in the Alders section of zone 5 of Fear & Loaming. Berms, jumps, drain & tread work performed.

Trail inspections performed on Fear & Loaming, Gnarstow & Bat Country. Some small branches / storm debris down in places, but no hazards reported.
Idealview
Nov 29, 2025 @ 10:49am (America/Los_Angeles)
Nov 29, 2025
mtb Upper gnarstow armoring and tread work, drainage, Zone 1.
Variableview
Oct 30, 2025 @ 11:56am (America/Los_Angeles)
Oct 30, 2025
mtb Trails are reported to be clear of any downed trees as of 10/28. Expect small branches/twigs after a typical fall storm event. Variableview
Oct 9, 2025 @ 9:50pm (America/Los_Angeles)
Oct 9, 2025
mtb Idealview
Apr 13, 2025 @ 10:56am
Apr 13, 2025
mtb Variableview
Mar 27, 2025 @ 6:41pm
Mar 27, 2025
mtb muddy with patches of snow in some spots
Other than that trail was running well despite being greasy. There were no downed trees some overgrown bushes but other than that it was great
Wetview
Mar 3, 2025 @ 7:20am
Mar 3, 2025
mtb All downed trees cleared from the windstorm from a week ago. lower steeps received a rake-out
Idealview
Mar 2, 2025 @ 6:37pm
Mar 2, 2025
mtb Runnin' good today. One large tree down right after the lower flow section before the final few chutes. Idealview
Sep 15, 2024 @ 1:28pm
Sep 15, 2024
mtb Idealview
Sep 8, 2024 @ 10:49am
Sep 8, 2024
mtb Very Dryview
Aug 29, 2024 @ 6:22pm
Aug 29, 2024
mtb Very Dryview
Aug 4, 2024 @ 2:42am
Aug 4, 2024
mtb Very Dryview
Jun 27, 2024 @ 2:49pm
Jun 27, 2024
mtb decent early summer form. Going to get loose and rocky soon as it beds in to it's inaugural Summer. Variableview
Jun 5, 2024 @ 9:19am
Jun 5, 2024
mtb Fresh trailwork / repairs performed the evening of 6/4. The double/gap at the bottom of the first triple-option-line is wet/soft and is blocked off (new/fresh lip). Also some drainage improvements performed on the long benched/segment. Variableview
Apr 19, 2024 @ 9:01am
Apr 19, 2024
mtb Steep and deep. Running great! Idealview

Login to view work report summary