| date | description | condition | ||
|---|---|---|---|---|
Sep 7, 2026 @ 10:35am (America/Vancouver) Sep 7, 2026 | mtb 49er trails will be closed September 8-18th for road maintenance, 7-5pm Monday to Friday. Crews plan to have access open after 5pm, and on weekends if possible. Please respect all posted signage and barricades. reporter | Unknown | view | |
Jun 3, 2026 @ 4:23pm (America/Vancouver) Jun 3, 2026 | mtb Several trees bucked off the trail today. A little brushy in sections but good to go. reporter | Ideal | view | |
May 7, 2026 @ 2:29pm (America/Vancouver) May 7, 2026 | mtb Resident skunk close to the top. One tree down halfway down on the climb. Will cut it out in a few days. reporter | Dry | view | |
Apr 9, 2026 @ 11:02am (America/Creston) Apr 9, 2026 | mtb | Snow Cover Partial | view | |
Oct 5, 2025 @ 2:14pm (America/Creston) Oct 5, 2025 | mtb Bunch of trees down at the start of the trail. | Dry | view | |
Jul 12, 2025 @ 6:42pm Jul 12, 2025 | mtb | Ideal | view | |
Apr 15, 2025 @ 6:23pm Apr 15, 2025 | mtb Lots of trees down, mostly smaller. | Dry | view | |
Sep 12, 2024 @ 11:36am Sep 12, 2024 | mtb all trees (approx. 7) have been cleared. trail is brushy but good to go. reporter | Dry | view | |
Aug 13, 2024 @ 3:17pm Aug 13, 2024 | mtb Two wood features over down trees in lower section | Dry | view | |
May 26, 2024 @ 12:55pm May 26, 2024 | mtb After the first road/double track crossing, about 50 or more meters in there’s a tree down, about 17 inches in width. I did not have the tools (or friend help with a pocket saw), and my muscles couldn’t budge it. | Ideal | view | |
Apr 9, 2024 @ 9:18am Apr 9, 2024 | mtb 10 trees down that require a Chainsaw, pretty consistently throughout the trail. First tree down within 10-15m is f the start. Few snow patches but easy to cruise through. Hand bombed everything I could for the rest of the trail. | Ideal | view | |
Jun 28, 2023 @ 4:43am Jun 28, 2023 | mtb Clear top to bottom | Ideal | view | |
Jun 25, 2023 @ 6:12am Jun 25, 2023 | mtb Top part is clear ride it!. Transition up to Jack's leg at the logging road as the bottom part has a one bundle of tree a one place and a unrouted stump. | Ideal | view | |
Jun 2, 2023 @ 4:20pm Jun 2, 2023 | mtb Overgrown and lost track of the number of trees down | Dry | view | |
Jun 2, 2023 @ 4:20pm Jun 2, 2023 | mtb Overgrown with many trees down | Dry | view | |
Sep 2, 2022 @ 1:35pm Sep 2, 2022 | mtb reporter | Dry | view | |
Aug 29, 2022 @ 11:46am Aug 29, 2022 | mtb reporter | Dry | view | |
Aug 29, 2022 @ 10:28am Aug 29, 2022 | mtb Re-opened after logging. New road transition built by trail crew reporter | Unknown | view | |
Jun 3, 2022 @ 12:30pm Jun 3, 2022 | mtb Closed until further notice due to logging activity. reporter | Unknown | view | |
Oct 23, 2021 @ 1:43pm Oct 23, 2021 | ebike Trail all clear until you get below the new road. There is a 20m trail cut through the timber to walk your bike down to the old Moosehead line, then ride 30m and you get back onto Moosehead trail. | Variable | view | |
Oct 8, 2021 @ 11:53am Oct 8, 2021 | mtb Top half in great shape. Bottom has a few smaller trees over the trail and then the newly built road crossing. The latter has left a large pile of birch obstructing the trail on the downhill side of the road. | Variable | view | |
Sep 10, 2021 @ 9:00am Sep 10, 2021 | mtb 49er trails will be closed between 7am - 3:30pm starting Thursday September 2 lasting about a week. Atco Lumber is working on the new logging road. Weekends are still open all day. reporter | Unknown | view | |
Jul 5, 2021 @ 8:06am Jul 5, 2021 | mtb Access to the 49er trails in Blewett will be CLOSED on JULY 5 for 2-3 days while a new culvert is installed at the start of May and Jenny Road. There will be NO ACCESS during the work days, so you won’t be able to ride the trails until later in the evening. Atco Lumber says to expect more road closures over the coming weeks while they upgrade the road and improve the parking area. Stay tuned for more updates from the Nelson Trailcrew as the road building progresses and the logging starts. | Dry | view | |
Aug 6, 2019 @ 3:57pm Aug 6, 2019 | mtb Cut out several large trees that had fallen across the trail, and gave the trail a quick raking. | Dry | view | |
Jul 3, 2019 @ 12:44pm Jul 3, 2019 | mtb Head sweeper log across the trail about half way down, Bush is growing over the trail with all the rain Thank you very much to the 49'r trail keepers!!! | Unknown | view |
- previous page
Login to view work report summary