More Filters
datedescriptioncondition
Sep 7, 2026 @ 10:35am (America/Vancouver)
Sep 7, 2026
mtb 49er trails will be closed September 8-18th for road maintenance, 7-5pm Monday to Friday. Crews plan to have access open after 5pm, and on weekends if possible. Please respect all posted signage and barricades. reporter Unknownview
Jun 3, 2026 @ 4:23pm (America/Vancouver)
Jun 3, 2026
mtb Several trees bucked off the trail today. A little brushy in sections but good to go.
reporter
Idealview
May 7, 2026 @ 2:29pm (America/Vancouver)
May 7, 2026
mtb Resident skunk close to the top. One tree down halfway down on the climb. Will cut it out in a few days.
reporter
Dryview
Apr 9, 2026 @ 11:02am (America/Creston)
Apr 9, 2026
mtb Snow Cover Partialview
Oct 5, 2025 @ 2:14pm (America/Creston)
Oct 5, 2025
mtb Bunch of trees down at the start of the trail. Dryview
Jul 12, 2025 @ 6:42pm
Jul 12, 2025
mtb Idealview
Apr 15, 2025 @ 6:23pm
Apr 15, 2025
mtb Lots of trees down, mostly smaller. Dryview
Sep 12, 2024 @ 11:36am
Sep 12, 2024
mtb all trees (approx. 7) have been cleared. trail is brushy but good to go.
reporter
Dryview
Aug 13, 2024 @ 3:17pm
Aug 13, 2024
mtb Two wood features over down trees in lower section Dryview
May 26, 2024 @ 12:55pm
May 26, 2024
mtb After the first road/double track crossing, about 50 or more meters in there’s a tree down, about 17 inches in width. I did not have the tools (or friend help with a pocket saw), and my muscles couldn’t budge it. Idealview
Apr 9, 2024 @ 9:18am
Apr 9, 2024
mtb 10 trees down that require a Chainsaw, pretty consistently throughout the trail. First tree down within 10-15m is f the start. Few snow patches but easy to cruise through. Hand bombed everything I could for the rest of the trail. Idealview
Jun 28, 2023 @ 4:43am
Jun 28, 2023
mtb Clear top to bottom Idealview
Jun 25, 2023 @ 6:12am
Jun 25, 2023
mtb Top part is clear ride it!. Transition up to Jack's leg at the logging road as the bottom part has a one bundle of tree a one place and a unrouted stump. Idealview
Jun 2, 2023 @ 4:20pm
Jun 2, 2023
mtb Overgrown and lost track of the number of trees down Dryview
Jun 2, 2023 @ 4:20pm
Jun 2, 2023
mtb Overgrown with many trees down Dryview
Sep 2, 2022 @ 1:35pm
Sep 2, 2022
mtb reporter Dryview
Aug 29, 2022 @ 11:46am
Aug 29, 2022
mtb reporter Dryview
Aug 29, 2022 @ 10:28am
Aug 29, 2022
mtb Re-opened after logging. New road transition built by trail crew reporter Unknownview
Jun 3, 2022 @ 12:30pm
Jun 3, 2022
mtb Closed until further notice due to logging activity. reporter Unknownview
Oct 23, 2021 @ 1:43pm
Oct 23, 2021
ebike Trail all clear until you get below the new road. There is a 20m trail cut through the timber to walk your bike down to the old Moosehead line, then ride 30m and you get back onto Moosehead trail. Variableview
Oct 8, 2021 @ 11:53am
Oct 8, 2021
mtb Top half in great shape. Bottom has a few smaller trees over the trail and then the newly built road crossing. The latter has left a large pile of birch obstructing the trail on the downhill side of the road. Variableview
Sep 10, 2021 @ 9:00am
Sep 10, 2021
mtb 49er trails will be closed between 7am - 3:30pm starting Thursday September 2 lasting about a week. Atco Lumber is working on the new logging road. Weekends are still open all day. reporter Unknownview
Jul 5, 2021 @ 8:06am
Jul 5, 2021
mtb Access to the 49er trails in Blewett will be CLOSED on JULY 5 for 2-3 days while a new culvert is installed at the start of May and Jenny Road. There will be NO ACCESS during the work days, so you won’t be able to ride the trails until later in the evening. Atco Lumber says to expect more road closures over the coming weeks while they upgrade the road and improve the parking area. Stay tuned for more updates from the Nelson Trailcrew as the road building progresses and the logging starts. Dryview
Aug 6, 2019 @ 3:57pm
Aug 6, 2019
mtb Cut out several large trees that had fallen across the trail, and gave the trail a quick raking.
Dryview
Jul 3, 2019 @ 12:44pm
Jul 3, 2019
mtb Head sweeper log across the trail about half way down,
Bush is growing over the trail with all the rain
Thank you very much to the 49'r trail keepers!!!
Unknownview

Login to view work report summary