More Filters
datedescriptioncondition
Jun 23, 2026 @ 6:04pm (America/Chicago)
Jun 23, 2026
mtb Pruned hangers to where the corridor has been trimmed, roughly 70% of OxFlow is trimmed and pruned
reporter
Idealview
Oct 8, 2025 @ 7:00pm (America/Chicago)
Oct 8, 2025
mtb TREE REPORT 10/8/2025
Only a few smaller trees down. reporter
Idealview
Jul 23, 2025 @ 9:08pm
Jul 23, 2025
mtb VEGETATION:
Oxflow is completely overgrown.
There is also a tree down that prevents mowers from going all the way through. reporter
Prevalent Mudview
Jul 10, 2025 @ 8:29am
Jul 10, 2025
mtb Vegetation:
It is interesting that ox flow was started to be mowed, but then they stopped. it looks like this happened recently. reporter
Prevalent Mudview
Mar 3, 2025 @ 12:57pm
Mar 3, 2025
mtb Muddy in most spots not ridable

Forecasted rain will require 2-3 more weeks for oxbow to dry. reporter
Freeze/thaw Cycleview
Sep 19, 2024 @ 11:24am
Sep 19, 2024
mtb SIGNAGE:
future signage and spots that will need a few trees cleared back when we have an excavator to help with visibility reporter
Dryview
Aug 16, 2024 @ 10:26pm
Aug 16, 2024
mtb Walked and rode all of Sandy Wash.
Documented trees and cleared a few that could done quickly on limited time.
reporter
Variableview
Aug 16, 2024 @ 10:21pm
Aug 16, 2024
mtb TREES/VEGETATION:
Oxflow needs major corridor clearing. reporter
Idealview
Jun 26, 2024 @ 12:30pm
Jun 26, 2024
mtb VEGETATION: oxflow corridor needs trimmed and mowed. Several spots with low hanging tree branches and tall weeds on trail. reporter Idealview
May 7, 2024 @ 11:31am
May 7, 2024
mtb reporter Variableview
Apr 17, 2024 @ 5:45am
Apr 17, 2024
mtb reporter Wetview
Apr 10, 2024 @ 7:34pm
Apr 10, 2024
mtb reporter Dryview
Apr 3, 2024 @ 7:45pm
Apr 3, 2024
mtb reporter Idealview
Apr 2, 2024 @ 6:52pm
Apr 2, 2024
mtb reporter Idealview
Jun 15, 2023 @ 6:20pm
Jun 15, 2023
mtb Good running, starting to get overgrown. Overall, fun track. Dryview
Oct 24, 2020 @ 12:51pm
Oct 24, 2020
mtb Idealview
May 29, 2019 @ 9:54am
May 29, 2019
mtb Flooding occurred and will take 10-14 days to dry out and be cleared Prevalent Mudview

Login to view work report summary