More Filters
datedescriptioncondition
Oct 11, 2026 @ 10:00am (America/Halifax)
Oct 11, 2026
mtb Leaf Blown, Dragline, Reclamation, Rush'n Thru, Return to Sender, Let is Raine, Famer Kenny, Maid Marion, Spoil Banks, The Seam, Tabula Rasa, Highwall, Pit Pony, Green and Blue Flow trails.
reporter
Idealview
Jun 14, 2026 @ 12:36pm (America/Moncton)
Jun 14, 2026
mtb Idealview
May 4, 2024 @ 5:45am
May 4, 2024
mtb Idealview
Oct 29, 2023 @ 7:43am
Oct 29, 2023
mtb Idealview
Aug 1, 2023 @ 1:00pm
Aug 1, 2023
mtb Greenification - Corridor clearing, rock armored dip installation and benching
Volunteer training - Helped with corridor clearing, benching and test riding.
reporter
Unknownview
Jul 27, 2023 @ 1:00pm
Jul 27, 2023
mtb Tread - IMBA spec Greenification
reporter
Unknownview
Jul 16, 2023 @ 10:00am
Jul 16, 2023
mtb Rode the trails to identify drainage issues and corridor growth. Assessed problem areas.
reporter
Unknownview
Jul 10, 2023 @ 10:45am
Jul 10, 2023
mtb Greenification - Corridor clearing and started rock armored dip.
reporter
Unknownview
Jul 7, 2023 @ 10:40am
Jul 7, 2023
mtb Greenification - Confirmed gradients (DH) on line #2. Lopped corridor
reporter
Unknownview
Jul 4, 2023 @ 10:25am
Jul 4, 2023
mtb Drainage - Inspected climb trail. Entry could be graded better.
reporter
Unknownview
Apr 17, 2023 @ 1:15pm
Apr 17, 2023
mtb Scoped out new line on Reclamation. Reclamation will be a green loop. For new riders who wish to do an introduction ride.
reporter
Unknownview
Apr 25, 2022 @ 12:30pm
Apr 25, 2022
mtb Knocked out little stumps and re-benched some trail tread.
reporter
Variableview
Apr 23, 2022 @ 8:00am
Apr 23, 2022
mtb More Leaf Blowing by the super crew...MacIntosh, MacIntosh, Smith, smith, Silva, Fairweather, and Moores
reporter
Unknownview
Oct 8, 2021 @ 9:27am
Oct 8, 2021
mtb Idealview

Login to view work report summary