| date | description | condition | ||
|---|---|---|---|---|
Sep 22, 2026 @ 5:01pm (America/Vancouver) Sep 22, 2026 | mtb Running great | Dry | view | |
Aug 15, 2026 @ 2:40pm (America/Vancouver) Aug 15, 2026 | ebike reporter | Dry | view | |
May 24, 2026 @ 4:43pm (America/Vancouver) May 24, 2026 | mtb Rebuilt berm at bottom of the big rock roll. Trimmed back over growth between roca and salsa. | Dry | view | |
May 15, 2026 @ 9:33pm (America/Vancouver) May 15, 2026 | mtb Cleared downed trees. Raked trail top to bottom. Good to go! | Ideal | view | |
Apr 9, 2026 @ 12:06am (America/Vancouver) Apr 9, 2026 | mtb Tree down on the gap jump after the drop. Then another down on the 3 skipper jumps. | Unknown | view | |
Nov 23, 2025 @ 9:17am (America/Vancouver) Nov 23, 2025 | mtb Unflatted the landing of an optional skipper gap/drop near the junction with Southern Accent. Should be much more pleasant for people rolling and sending the rock now. Installed armour and capped the landing for the drop/roll heading into the final jump line. Filled holes in tread along the way and buried some rocks that were poking out To bring back that new trail feel. 10 year revamp almost complete! If the weather holds a full top to bottom will be complete. A bit but soggy but running great thanks to new drainage. | Wet | view | |
Nov 11, 2025 @ 7:07pm (America/Vancouver) Nov 11, 2025 | mtb Fixed up the corner going into the banked bridge. Patched up holes in the tread after the banked bridge. With the added speed boost into the next section built a new fun sized table top. Added new drainage in the landing to keep your toes dry and wheels rolling fast on the wet days via a dirt topped bridge. Get it before winter hits! | Variable | view | |
Nov 1, 2025 @ 5:39pm (America/Vancouver) Nov 1, 2025 | mtb Didn’t find any forest kitty’s but did finish bucketing dirt and slapping the newest landing in. Also filled in and shaped the corner going into the banked bridge that was looking a bit worse for wear. 10 year revamp continues…. | Wet | view | |
Oct 27, 2025 @ 10:40am (America/Vancouver) Oct 27, 2025 | mtb 2 Cougars in the area. Travel in groups! Make noise reporter | Unknown | view | |
Oct 15, 2025 @ 8:47pm (America/Vancouver) Oct 15, 2025 | mtb Dan and I were checking out a good spot to film our sick backflips off the big spicy drop, and it's a good thing we looked because there was a tree down over the following double. Cleared that tree and another one lower down. Dan's saw is sharp but a little smaller than what I'm used to. reporter | Ideal | view | |
Oct 11, 2025 @ 4:45pm (America/Vancouver) Oct 11, 2025 | mtb Continued work in 2nd growth section. Reworked in another small step down that used to exist before all the loam blew out. Started cribbing and placing rocks for the landing. Still rideable as is. Enjoy! | Wet | view | |
Oct 4, 2025 @ 4:47pm (America/Vancouver) Oct 4, 2025 | mtb New landing for updated step down completed. Repaired tread on runout in multiple spots. Removed roots and a couple stumps. Buff as! | Wet | view | |
Sep 30, 2025 @ 5:18pm (America/Vancouver) Sep 30, 2025 | mtb Re-alignment of corner leading into new step down completed. Buff landing and repair tread on run out. Started landing construction for another ‘new’ step down further down the trail. Should be done in a few weeks. Everything still rideable while under construction. | Wet | view | |
Sep 27, 2025 @ 4:04pm (America/Vancouver) Sep 27, 2025 | mtb Completed armouring of the entrance into the second growth. Rebuild small step down that has disappeared over the years. Repair tread in the landing for the step down. Now ‘hip-able’ for added for steeeeeze points. | Unknown | view | |
Sep 21, 2025 @ 4:34pm (America/Vancouver) Sep 21, 2025 | mtb Trail realignment and rut repair just above the second growth. Repaired first jump in the second growth as well as the landing. Tune up both line options going into the corner afterwards. Great conditions after the rain. Get some! | Unknown | view | |
Jul 13, 2025 @ 4:30pm Jul 13, 2025 | mtb Opened up two new ride arounds to avoid gap jumps. Please use this instead of skidding over jumps or walking over them. Cut out and cleared danger tree that was ready to fall any day. Filled holes and repaired tread just before second growth starts. Primo conditions, enjoy! Back after next major rainfall to continue the 10 year revamp. 1/2 way there! | Ideal | view | |
Jun 28, 2025 @ 5:31pm Jun 28, 2025 | mtb 10 year revamp continues…Filled holes and repaired various landings on top half of the trail. Re-loamed and fill holes in tech section just above 2nd growth. Lower half of trail repairs will continue following weekend if it first dry out too much. | Dry | view | |
May 25, 2025 @ 12:27pm May 25, 2025 | mtb Open up lower jump line. Buffed and filled holes on the bench cut leading into the jumps. Good to go, get some! | Ideal | view | |
May 17, 2025 @ 7:06pm May 17, 2025 | mtb Roughed in a new rock roll as a b line for one of the jumps. Raked bottom 1/2 of trail and reshaped the jump line at the bottom. One of the bottom jumps will remain closed until the new work dries a bit. Still possible to ride around in the meantime. | Ideal | view | |
May 4, 2025 @ 6:04pm May 4, 2025 | mtb Cut out reported fallen tree. Add dirt and reshape multiple jumps. Rake top 1/2 of trail. Replace broken slat on beer bridge. One jump closed until rain and a repack. Please walk around, currently blocked off by buckets. | Ideal | view | |
Apr 23, 2025 @ 8:37pm Apr 23, 2025 | mtb Tree down halfway down | Ideal | view | |
Apr 23, 2025 @ 8:36pm Apr 23, 2025 | mtb A tree down halfway down | Dry | view | |
Apr 23, 2025 @ 8:35pm Apr 23, 2025 | mtb Has a tree down halfway down | Ideal | view | |
Nov 28, 2024 @ 7:46pm Nov 28, 2024 | mtb | Snow Covered | view | |
Sep 1, 2024 @ 5:57pm Sep 1, 2024 | mtb Wasp nest about halfway down. Another rider got stung a couple times. Be careful! | Ideal | view |
- previous page
Login to view work report summary