more stats
1.7 miles
Distance
177 ft
Climb
-111 ft
Descent
00:14:17
Avg time
66 ft
Altitude change
906 ft
Altitude min
1,015 ft
Altitude max
918 ft
Altitude start
984 ft
Altitude end
0.7%
Grade
-15.6%
Grade max
11.7%
Grade min
4,324 ft
Distance climb
3,471 ft
Distance down
682 ft
Distance flat
00:14:17
Avg time

Split Rail Road Trail Details

  • Activities
    • Mountain Bike
    • E-Bike
    • Gravel Bike
    • Horse
    • Hike
    • Trail Running
    • ATV/ORV/OHV
    • Snowmobile
    • Snowshoe
    • Nordic Ski
  • Riding Area
    Northumberland County Forest
    Alnwick/Haldimand Township, Ontario
  • Difficulty Rating
  • Local Popularity
    70 in Mountain Biking heatmap [+]
    • 5 in E-Biking
    • 5 in Trail Running
    • 5 in Hiking
    • 5 in ATVing/Offroading
    • 5 in Horseback
    • 5 in Snowshoeing
    • 5 in Nordic Skiing
    • 5 in Snowmobiling
    • 5 in Gravel Biking
  • Hiking SAC Scale
    T1 Hiking
  • Trail Type
    Doubletrack
  • Snow Grooming
    Backcountry
  • Bike Type
    Gravel
  • Direction
    Both Directions[+]
    Popular Direction Shown
    • Both Directions for Gravel Biking
  • Dogs Allowed
    Yes
  • eBike Allowed
  • Land Owner
    Northumberland County Forest

No community description for Split Rail Road Trail trail has been added yet!

AI Generated Description

Split Rail Road Trail is a 3 km popular doubletrack trail located near Alnwick/Haldimand Township Ontario. This multi-use trail can be used both directions. Winter use: Backcountry snow grooming. On average it takes 14 minutes to complete this trail.

Tags

Local Trail Association

  • trail association logo
  • Please consider joining or donating to the local trail association to support
    trail development & maintenance.
view (24)

Recent Activity on Trail

Past Week
  • 0 rides
  •  
6 Months
  • 0 rides
  •  
All
  • 2 rides
  • Last: Sep 5, 2026
c1c2c3c4
January
February
March
April
May
June
July
August
September
October
November
December
update trails status or condition

Split Rail Road... Trail Reports

Status:
on Oct 19, 2025
Variable
no votes yet
Your vote: 0
close
      Directions to split-rail-road-trail trailhead (44.105050, -78.099530)

      Photos

      1 more »
      mtb
      58 |
      Sep 30, 2024 @ 6:51pm
      Sep 30, 2024

      Videos

      no videos have been added for Split Rail Road Trail yet, add a video.

      Reviews / Comments

      No reviews yet, be the first to write a review or ask a question.
      Use trail reports to comment on trail conditions.


      We hope you've been enjoying Trailforks!

      Create a FREE account to view all trail reviews and much more.

      • By CanadmosTF Pro TRAILFORKS & contributors
      • #770708 - 212 views

      Frequently Asked Questions

      ▼ Where is Split Rail Road Trail located?
      Split Rail Road Trail is located in Northumberland County Forest, Alnwick/Haldimand Township, Ontario, Canada. It is part of the Northumberland County Forest trail network. The trailhead is located at coordinates 44.10505, -78.09953.
      ▼ What is the elevation gain for Split Rail Road Trail?
      Split Rail Road Trail has 177 ft of elevation gain. The trail has 111 ft of elevation descent. The elevation ranges from 906 ft to 1,015 ft.
      ▼ Is Split Rail Road Trail a point to point trail?
      Split Rail Road Trail is not a point to point trail. The direction is Both Directions. The trail type is doubletrack.
      ▼ How long is Split Rail Road Trail?
      Split Rail Road Trail is 1.7 miles long. The trail type is doubletrack.
      ▼ Are dogs allowed on Split Rail Road Trail?
      Yes, dogs are allowed on Split Rail Road Trail. Please keep dogs on a leash where required and clean up after them.
      ▼ When is the best time of year to ride Split Rail Road Trail?
      Based on activity log data, the most popular months to ride Split Rail Road Trail are:
      • January (1 activities)
      • August (1 activities)
      Check the reports page for current trail conditions.
      ▼ How do I access Split Rail Road Trail? Where is the closest parking trailhead?
      The closest parking and trailhead locations to Split Rail Road Trail are: View all parking locations in the area.
      ▼ How long does it take to ride Split Rail Road Trail?
      Based on recorded activities, it takes an average of 14 minutes to ride Split Rail Road Trail. The trail is 1.7 miles long. Actual times will vary based on fitness level, conditions, and pace. View recent activity logs for more details.
      ▼ How busy is Split Rail Road Trail?
      Split Rail Road Trail is a very popular trail. There have been 22 recorded activities on this trail. The trail has received 24 check-ins. View recent activity on this trail.

      Hit the Trail

      Open in App

      Get this trail on your phone instantly.
      open trail in app

      Download Trail

      Save to wishlist, Garmin & download.
      save the trail

      Find Related Routes

      Find routes and users activities that include this trail.
      find routes for this trail

      You must enter a description before submitting.