Trailwork on Josho's
Trail Day Details:

We'll work on Josho's and maybe Rattlesnake and/or Ring Dike depending on turnout. We just need to shore up drainage features and clear out drains so that these trails are ready for winter and prepared to drain snowmelt next spring.

We'll start on Josho's from the Rattlesnake side and work all the way to the bottom and back up toward the Powerline road. Then we'll do similar work on southern Rattlesnake. With a good turnout and enough experienced crew leaders, we could work on both at the same time.

We'll be at the intersection of Josho's and Rattlesnake with tools in either the Heights/Turner Toyota truck or the silver Suburban at 4pm. If you come late, sign in, grab a tool and find us, most likely down on Josho's.

We'll be leaving Gunnison at 330pm. Please call or text if you plan to ride out with us: 970-275-0485.

We'll work until dusk and brats and beverages will be enjoyed after our work.

Please wear closed toed shoes, long pants, gloves and eyewear. Sunscreen, water and additional clothing for the weather are highly recommended.

Comments

Commenting is disabled for past events.

Trail

90 4.8 2 miles 399 ft 897
Popular blue difficulty singletrack. This multi-use trail can be used both directions and has a moderate overall physical rating with a 399 ft blue climb. On average it takes 23 minutes to complete this trail.
view trail detail
Audience: local
[flag]