• Trail:
  • Pipehill (Erindale Park)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Wet - wet & tacky, likelihood of mud, be kind to trails
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Removed fallen tree from between the two chutes.
Built a catch berm at the bottom of the first chute.
Added more drainage on the first chute to hopefully reduce the mud once things dry out.
Put a second concrete paver in line with the first one on the first chute to again reduce the mud there.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 3 volunteer hours
  • 1 total workers
  • 3.0 total work hours
Individual Workers:
gnarcissist
hours: 3
paid: no

Previous Reports

statusdatedescription
Jul 20, 2026 @ 10:30am
Jul 20, 2026
muddy and very slippery on the last section with all the roots. very sketchy, wait until dry. consider walking the bike down in the last section. view
Jul 9, 2026 @ 1:52pm
Jul 9, 2026
Bushy tree down across trail right before north side descent. Can push bike thru but ideally come back with hand saw. view
Apr 25, 2026 @ 11:07am
Apr 25, 2026
tree cleared view

0 Comments






  • 0
  • Share with followers