- Trail:
- Front Door (Pheasant Glen)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Ideal - Hero dirt! Not wet but not dry, moisture in soil.
- Reporter Primary Activity:
- Mountain Bike
Description:
Cleared trail of a few small branches, stinging nettles and weeds, not nearly as bad as last Spring! Installed a variable 6” to 4’ drop feature at the exit near also Entrails, double duty!
Cleared beaver dropped alders from lower section. Installed trail sign at entrance.
Cleared beaver dropped alders from lower section. Installed trail sign at entrance.
- Work Report:
- trail work done
- 1 volunteer attendees
- 5 volunteer hours
- 1 total workers
- 5.0 total work hours
Individual Workers: