- Trail:
- Kellner Canyon Trail (Pinal Mountain Trail System)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Dry -
- Reporter Primary Activity:
- Mountain Bike
Description:
Kellner is tree free and all but the middle 1/3rd of a mile the corridor has been brushed open and catsclaw and other briar bushes have been grubbed out. Riding better than after the 2017 fire right now. Still expect the loose rubble that is to be expected with a back country ride. Trail work is done until fall on this trail.