Description:
Work on the front side trail is done. It now features machine-built standard width all the way, and switchbacks through all the previous steeps. It's still very steep, but consistent grade. Drainage improved throughout. Flatter sections are similar to the original trail and have not been changed much. Old trail alignment has been heavily decommissioned with deadfall.

0 Comments






  • By excelTF Pro
  • #3054944 - trailforks
  • 0
  • Share with followers