- Trail:
- Freak On A Leash (Glenwood Forest Trails)
- Status:
- All Clear / Green
-
Issue status: Complete
Complete Mar 2, 2025 @ 6:06pm jack-advancedtraildesign Open Mar 2, 2025 @ 6:06pm jack-advancedtraildesign - Condition:
- Dry -
- Reporter Primary Activity:
- Mountain Bike
Description:
Bottom of Mid Section
excavator required
- Clear Weeds on machine built section above road crossing.
- Smooth rutted sections of trail in machine built section above road crossing.
- Build up drop to act as better trail filter.
excavator required
- Clear Weeds on machine built section above road crossing.
- Smooth rutted sections of trail in machine built section above road crossing.
- Build up drop to act as better trail filter.
- Work Report:
- trail work done
- 230 feet worked
- 1 paid attendees
- 8 paid hours
- 1 total workers
- 8.0 total work hours
Individual Workers:
DWE
hours: 8
paid: yes
Local Weather During Report
- Summary
Clear - Temperature
27° (14°/29°) - Precip
0 mm/h - Wind
7.25 km/h - Cloud Cover
2% - Humidity
0.38