The overall region status for Orange is Open as of Feb 25, 2026 ago
Trail Conditions Summary
Please log in to view the trail conditions summary.
| trail | region | date | description | condition | ||
|---|---|---|---|---|---|---|
Jul 5, 2026 @ 4:10pm (Australia/Sydney) Jul 4, 2026 | mtb Maintenance work, repairing some ruts. reporter | Ideal | view | |||
Jun 28, 2026 @ 5:49pm (Australia/Sydney) Jun 28, 2026 | mtb Raked away debris top section 3 hours work | Unknown | view | |||
Jun 28, 2026 @ 5:46pm (Australia/Sydney) Jun 28, 2026 | mtb Large tree across trail about 300m before first road crossing, bypass trail about 20 metres before tree leading to fire trail | Unknown | view | |||
Jun 28, 2026 @ 10:49am (Australia/Sydney) Jun 27, 2026 | mtb Trail Audit 2026 - signs in place notifying of direction and rating. -give way signs at fire trail crossings. -sign at end of Adaptive rated section notifying for Adaptive bikes to turn around. -steepest section 14%, measured near top of trail. -all 3 bridges stable and in good condition. - near the midway point, some grade dips are filling with water. Rake out down hill from it to let water flow out. MAX GRADIENT (%): 14 TRAIL WIDTH (mm): 900 ± 300 TREAD SURFACE : Mostly firm and stable LEVEL OF EXPOSURE: Downward slopes of up to 50% (besides creek but protected by vegetation) MAX HEIGHT OF UNAVOIDABLE OBJECTS (mm): 100 JUMPS: None MIN WIDTH OF UNAVOIDABLE BRIDGES (mm): 900 (at rock crossing to fix for Adaptive bikes, steel bridges 1200mm wide) MOUNTAIN BIKE TRAIL RATING: Easy (green) BIKE TYPE: XC/Trail reporter | Variable | view | |||
Jun 23, 2026 @ 5:40am (Australia/Sydney) Jun 22, 2026 | mtb Cut back veg, rake away debris | Unknown | view | |||
Jun 21, 2026 @ 1:10pm (Australia/Sydney) Jun 20, 2026 | mtb Trail audit 2026 - Trail sign at bottom notifying name direction and rating.(needs to be updated to Notify its Dual direction now) - Trail signs required at top to Notify of name, Dual direction and rating. Was converted to two way in 2026 to allow peaple from Trail of Awesomeness to access Galinbundinya and return to gravity event centre. -one switchback near centre of trail is very water logged. The bottom should be dug out with a drain. MAX GRADIENT (%) : 8 TRAIL WIDTH (mm): 900 ± 300 TREAD SURFACE : Mostly firm and stable LEVEL OF EXPOSURE: Downward slopes of up to 30% MAX HEIGHT OF UNAVOIDABLE OBJECTS (mm): 100 JUMPS: None MIN WIDTH OF UNAVOIDABLE BRIDGES (mm) :NA MOUNTAIN BIKE TRAIL RATING: Easy (green) BIKE TYPE: XC/Trail reporter | Wet | view | |||
Jun 21, 2026 @ 12:42pm (Australia/Sydney) Jun 20, 2026 | mtb Trail audit 2026 - signs in place at all entry points Notify of name, direction and rating. -signs in place to Notify of fire trail crossings. -steepest section 17%, measured between the switchbacks in the second block. -water is being held in some grade dips by pine needles. rake out to allow water to drain down hill. -near the centre of the trail, after a table top jump, water is pooling in a fall zone. This is a potential drowning hazard. Earthworks required to drain water. -after the centre points, some trail sections need vegetation control to prevent grasses, wattles and Biddy bush encroaching. MAX GRADIENT: (%) 17 TRAIL WIDTH (mm): 900 ± 300 TREAD SURFACE: Mostly firm and stable LEVEL OF EXPOSURE: Downward slopes of up to 50% MAX HEIGHT OF UNAVOIDABLE OBJECTS (mm): 200 JUMPS: Avoidable or rollable jumps MIN WIDTH OF UNAVOIDABLE BRIDGES (mm) : NA MOUNTAIN BIKE TRAIL RATING: Easy/Intermediate (green/blue) BIKE TYPE: XC/Trail reporter | Variable | view | |||
Jun 13, 2026 @ 6:35pm (Australia/Sydney) Jun 13, 2026 | mtb Cut and removed fallen trees, raked upper section removing debris pushed onto trail from pigs | Unknown | view | |||
Jun 6, 2026 @ 10:51am (Australia/Sydney) Jun 5, 2026 | mtb Multiple trees down | Unknown | view | |||
Jun 1, 2026 @ 2:38pm (Australia/Sydney) May 31, 2026 | mtb Pine straw removed and drains cleaned and minor erosion repairs first 2 sections | Variable | view | |||
May 10, 2026 @ 8:53pm (Australia/Sydney) May 10, 2026 | mtb Work on new B line to avoid techi Rocky section in middle. Aprox 100m built. reporter | Variable | view | |||
Apr 12, 2026 @ 9:00am (Australia/Sydney) Apr 11, 2026 | mtb Trail Work in Preparation for Club Gravity Event. -Cleared Vegetation. -Blocked shortcuts. -Smoothed surfaces. -Built new a-line jump near start. reporter | Variable | view | |||
Apr 4, 2026 @ 9:13am (Australia/Sydney) Apr 3, 2026 | mtb Right hand berm after triple needs a re-work. | Variable | view | |||
Apr 4, 2026 @ 9:12am (Australia/Sydney) Apr 3, 2026 | mtb Rake, trim and fixed rutted sections from triple jump to bottom. | Variable | view | |||
Mar 31, 2026 @ 7:53pm (Australia/Sydney) Mar 31, 2026 | mtb Large tree over trail just past first road crossing, removed with chain saw | Unknown | view | |||
Mar 31, 2026 @ 7:50pm (Australia/Sydney) Mar 31, 2026 | mtb Large tree over trail , just over first road crossing, removed with chain saw | Unknown | view | |||
Mar 29, 2026 @ 7:40pm (Australia/Sydney) Mar 29, 2026 | mtb Drain wet section of trail , bottom section | Ideal | view | |||
Mar 29, 2026 @ 3:50pm (Australia/Sydney) Mar 28, 2026 | mtb Running well, cleared one tree off track after last road crossing, a little leafy but not an issue | Dry | view | |||
Mar 29, 2026 @ 3:47pm (Australia/Sydney) Mar 28, 2026 | mtb Several trees chainsaw cleared, a bit leafy but not an issue, running well | Dry | view | |||
Mar 9, 2026 @ 2:30pm (Australia/Sydney) Mar 8, 2026 | mtb Ruts in lower sections, corners and jumps, needs repair. | Variable | view | |||
Mar 9, 2026 @ 2:11pm (Australia/Sydney) Mar 8, 2026 | mtb Trail needs raking and clearing of debris top to bottom. | Variable | view | |||
Mar 9, 2026 @ 2:08pm (Australia/Sydney) Mar 8, 2026 | mtb Trail needs raking, trimming and spraying for weed growth between event centre and trail end. Particularly areas without tree coverage. | Variable | view | |||
Mar 8, 2026 @ 8:46pm (Australia/Sydney) Mar 8, 2026 | mtb Work on new B line to avoid techi Rocky section in middle. Approx. 50m built. reporter | Variable | view | |||
Mar 2, 2026 @ 12:28pm (Australia/Sydney) Mar 1, 2026 | mtb | Dry | view | |||
Mar 2, 2026 @ 12:12pm (Australia/Sydney) Mar 1, 2026 | mtb 1.5 hours chainsaw work , clearing fallen trees | Unknown | view | |||
Feb 25, 2026 @ 9:06pm (Australia/Sydney) Feb 25, 2026 | mtb Excavator works on MTB trails as per 2026 Audit recommendations. reporter | Dry | view | |||
Feb 24, 2026 @ 9:03pm (Australia/Sydney) Feb 24, 2026 | mtb Excavator works on MTB trails as per 2026 Audit recommendations. reporter | Ideal | view | |||
Feb 23, 2026 @ 8:55pm (Australia/Sydney) Feb 23, 2026 | mtb Excavator works on MTB trails as per 2026 Audit recommendations. reporter | Dry | view | |||
Feb 22, 2026 @ 2:56pm (Australia/Sydney) Feb 21, 2026 | mtb Construction Details Advanced Trail Design, Design Time: 20hr Dave Wilton Excavation, Construction Time: 52hr Volunteer time on applying mulch and finishing touches: 57hr Central West Gravel: Material Donation Livingstone Tree Services: Mulch Donations reporter | Ideal | view | |||
Feb 8, 2026 @ 8:25pm (Australia/Sydney) Feb 8, 2026 | mtb Work on new B line to avoid techi Rocky section in middle. Aprox 75m built. reporter | Variable | view | |||
Feb 2, 2026 @ 1:05pm (Australia/Sydney) Feb 1, 2026 | mtb Clear overgrowth, re surface , clear out drainage points and grade reversals | Unknown | view | |||
Feb 2, 2026 @ 1:00pm (Australia/Sydney) Feb 1, 2026 | mtb | Unknown | view | |||
Jan 21, 2026 @ 7:40am (Australia/Sydney) Jan 20, 2026 | mtb BOTTOM SECTION CLOSED IN HARVESTING ZONE The first 2km of trail, from Lidster Fire Station and between Boree Creek and Boree Road, is closed while harvesting takes place in the area. Please keep clear for your own safety and the Clubs hard fought relations with Forestry. There is a risk of trees falling on the trails during harvesting. reporter | Dry | view | |||
Jan 19, 2026 @ 1:10pm (Australia/Sydney) Jan 18, 2026 | mtb Work on new B line to avoid techi Rocky section in middle. Aprox 75m built. reporter | Dry | view | |||
Jan 18, 2026 @ 10:35am (Australia/Sydney) Jan 17, 2026 | mtb 2nd block needs weed whacking and a rake. | Unknown | view | |||
Jan 18, 2026 @ 9:52am (Australia/Sydney) Jan 17, 2026 | mtb Tree down halfway up. | Ideal | view | |||
Jan 7, 2026 @ 2:19pm (Australia/Sydney) Jan 6, 2026 | ebike Bottom half closed till end jan 2026 | Unknown | view | |||
Jan 7, 2026 @ 2:18pm (Australia/Sydney) Jan 6, 2026 | ebike Closed till end of jan 2026… | Unknown | view | |||
Jan 4, 2026 @ 2:13pm (Australia/Sydney) Jan 3, 2026 | mtb A little leafy but running well | Variable | view | |||
Jan 4, 2026 @ 2:13pm (Australia/Sydney) Jan 3, 2026 | mtb A few puddles out and about but ok | Variable | view | |||
Jan 4, 2026 @ 2:13pm (Australia/Sydney) Jan 3, 2026 | mtb Trail is cleared and running well. A little bit of leaf litter but nothing bad | Variable | view | |||
Jan 4, 2026 @ 11:34am (Australia/Sydney) Jan 3, 2026 | mtb Move sign at first crossing, further from trail to avoid being hit. reporter | Variable | view | |||
Jan 4, 2026 @ 11:33am (Australia/Sydney) Jan 3, 2026 | mtb Moved sign at first crossing. reporter | Variable | view | |||
Jan 4, 2026 @ 6:50am (Australia/Sydney) Jan 3, 2026 | mtb | Dry | view | |||
Jan 4, 2026 @ 6:50am (Australia/Sydney) Jan 3, 2026 | mtb | Dry | view | |||
Dec 31, 2025 @ 9:48am (Australia/Sydney) Dec 30, 2025 | mtb Trees down large chainsaw required. - Cleared 19/01/26 | Dry | view | |||
Dec 28, 2025 @ 5:44pm (Australia/Sydney) Dec 27, 2025 | mtb Trail Improvements Top Opened new A-Line Drop Bermd out corners more after ruts formed from Gravity Enduro. reporter | Variable | view | |||
Dec 21, 2025 @ 11:21pm (Australia/Sydney) Dec 21, 2025 | mtb Weed control work reporter | Variable | view | |||
Dec 21, 2025 @ 11:15pm (Australia/Sydney) Dec 21, 2025 | mtb Weed control work reporter | Variable | view | |||
Dec 21, 2025 @ 11:09pm (Australia/Sydney) Dec 21, 2025 | mtb Weed control work reporter | Ideal | view | |||
Dec 21, 2025 @ 11:08pm (Australia/Sydney) Dec 21, 2025 | mtb Weed control work reporter | Variable | view | |||
Dec 21, 2025 @ 11:03pm (Australia/Sydney) Dec 21, 2025 | mtb Weed control work reporter | Ideal | view | |||
Dec 21, 2025 @ 10:57pm (Australia/Sydney) Dec 21, 2025 | mtb Weed control work reporter | Variable | view | |||
Nov 9, 2025 @ 5:25pm (Australia/Sydney) Nov 8, 2025 | mtb Work on new B line to avoid techi Rocky section in middle. Aprox 75m built. reporter | Ideal | view | |||
Nov 2, 2025 @ 9:48pm (Australia/Sydney) Nov 2, 2025 | mtb Repaired section in middle where 'French Line' was forming. Improved corners on proper line and cleared branch to improve vision into corner. reporter | Variable | view | |||
Nov 2, 2025 @ 9:44pm (Australia/Sydney) Nov 2, 2025 | mtb Restored section bottom section, 462m. Completed by Iconic Trails. Widened, smoothed out and restored grade reversals, jumps and drainage. reporter | Variable | view | |||
Nov 2, 2025 @ 9:35pm (Australia/Sydney) Nov 2, 2025 | mtb Restored top section, 400m. Completed by Iconic Trails. Widened, smoothed out and restored drainage. reporter | Variable | view | |||
Nov 2, 2025 @ 9:24pm (Australia/Sydney) Nov 2, 2025 | mtb Restored top section, 871m. Completed by Iconic Trails. Widened, smoothed out and restored grade reversals and drainage. reporter | Variable | view | |||
Nov 2, 2025 @ 9:19pm (Australia/Sydney) Nov 2, 2025 | mtb Restored section near middle, above cascades, 144m. Completed by Iconic Trails. Widened, smoothed out and restored drainage. reporter | Unknown | view | |||
Oct 24, 2025 @ 8:59pm (Australia/Sydney) Oct 24, 2025 | mtb Restored 757m section in the middle. Completed by Iconic Trails. Widened, smoothed and restored drainage points. reporter | Ideal | view | |||
Oct 14, 2025 @ 9:45pm (Australia/Sydney) Oct 14, 2025 | mtb Worked on a new B Line to avoid the technical and tight middle section. Time was primarily on watercourse crossing. reporter | Variable | view | |||
Oct 8, 2025 @ 11:00am (Australia/Sydney) Oct 7, 2025 | mtb | Dry | view | |||
Oct 8, 2025 @ 11:00am (Australia/Sydney) Oct 7, 2025 | mtb | Ideal | view | |||
Oct 8, 2025 @ 11:00am (Australia/Sydney) Oct 7, 2025 | mtb | Dry | view | |||
Oct 8, 2025 @ 11:00am (Australia/Sydney) Oct 7, 2025 | mtb | Dry | view | |||
Oct 8, 2025 @ 11:00am (Australia/Sydney) Oct 7, 2025 | mtb | Very Dry | view | |||
Oct 8, 2025 @ 11:00am (Australia/Sydney) Oct 7, 2025 | mtb | Dry | view | |||
Oct 4, 2025 @ 10:11am (Australia/Sydney) Oct 3, 2025 | mtb Fabulous ride | Ideal | view | |||
Sep 28, 2025 @ 9:11pm (Australia/Sydney) Sep 28, 2025 | mtb Repair work on Trail of Awesomeness. Repaired wild pig damage in the second block, re-forming trail bench. reporter | Ideal | view | |||
Sep 28, 2025 @ 1:53pm (Australia/Sydney) Sep 27, 2025 | mtb Fixed water/rut damaged sections of trail in lower section. Fixed berm and added rock armour to boggy section before rock roll. | Variable | view | |||
Sep 28, 2025 @ 10:57am (Australia/Sydney) Sep 27, 2025 | mtb TRAIL NOTIFICATION Please be aware the second block of trail of awesomeness will be closed 1pm - 4pm today (Sun 28th), for some urgent repairs. Wild pigs have had a real field day on one particular section. Apologies for any inconvenience, but we'll have many volunteers on site helping repair it for the rest of the holidays. If your riding this section before then, please take care, one trail section has become very narrow, with a drop on the outside. reporter | Ideal | view | |||
Sep 17, 2025 @ 1:00pm (Australia/Sydney) Sep 16, 2025 | mtb Volunteer Build Day. Worked on a new B Line to avoid the technical and tight middle section. A big thanks to the 14 volunteers who attended with a big contingent from Red Bend School - Forbes. reporter | Variable | view | |||
Sep 14, 2025 @ 1:00pm (Australia/Sydney) Sep 13, 2025 | mtb Volunteer Build Day. Again worked on a new B Line to avoid the technical and tight middle section. A big thanks to the 14 volunteers who attended with a big contingent from Red Bend School - Forbes. reporter | Variable | view | |||
Aug 30, 2025 @ 8:26pm Aug 30, 2025 | mtb Add Catch Berm at bottom rock garden, add a catch berm on the Rh side after the drop. This will open up more line options as people can launch further from the left then have it redirect them. currently the only line people ride is on the lh side. reporter | Variable | view | |||
Aug 30, 2025 @ 7:45pm Aug 30, 2025 | mtb Move Sign At first road crossing move the trail sign and post to the right about 1m. It sits a bit close to the trail and has been clipped by someone riding by. Have placed rocks beside it temporarily to prevent people riding close. reporter | Variable | view | |||
Aug 14, 2025 @ 1:23am Aug 14, 2025 | mtb Filled hole in A-line, to prevent catching a small tyre. reporter | Ideal | view | |||
Aug 14, 2025 @ 1:02am (Australia/Sydney) Aug 13, 2025 | mtb AUDIT 2025 Notes: - Direction signs in place notifying of rating. Maintenance Requirements: - Trail cupping occurring in sections. Excavate to restore to level, restore outsope and grade reversals. - Switchbacks are becoming deeply cupped. To restore: build roller at start, roller at end, and use to shed water before running through. - Towards end, A and B line exists. A is more challenging but B line easier. - A Big hole has formed in the A line. Fill in to prevent catching a tyre. reporter | Ideal | view | |||
Aug 9, 2025 @ 9:38pm Aug 9, 2025 | mtb Cleared vegetation at end for better visibility between bikes and cars. reporter | Variable | view | |||
Aug 8, 2025 @ 9:19am Aug 8, 2025 | mtb Small trees over track at the start and a larger tree over the track about half way down needing a chainsaw. | Variable | view | |||
Aug 6, 2025 @ 12:25am Aug 6, 2025 | mtb AUDIT SIGN ON 2025 LENGTH (m): 1800 START ELEVATION (m): 981 END ELEVATION (m): 875 ELEVATION DIFFERENCE (m): -106 AVERAGE GRADIENT (%): -5.9 MAX GRADIENT (%): 15 TRAIL WIDTH (mm): 900 ± 300 TREAD SURFACE: Mostly firm and stable LEVEL OF EXPOSURE: Downward slopes of up to 30% MAX HEIGHT OF UNAVOIDABLE OBJECTS (mm): 350 JUMPS: Avoidable or rollable jumps MIN WIDTH OF UNAVOIDABLE BRIDGES (mm): NA MOUNTAIN BIKE TRAIL RATING: Intermediate (Blue) BIKE TYPE: XC/Trail/AM notes: - signs in place notifying of direction and rating. - signs notifying to give way at fire trail intersections. - a and b line options for optional advanced and easier lines. all clearly visible on approach, except for one which has been signposted. -all culverts with adequate pipe sizes installed. maintenance: - at entry to fire trail at bottom, on left hand side, clear vegetation to give better view of incoming traffic. reporter | Variable | view | |||
Aug 3, 2025 @ 8:49pm Aug 3, 2025 | mtb Upgraded berm. -intstalled pipe in berm to drain out the water pooling in it, while maintaining the right shape for rider support. -started building a jump on the outside of the berm as a a-line. (Left bunted off until complete). reporter | Variable | view | |||
Aug 3, 2025 @ 5:44am Aug 3, 2025 | mtb Large tree blocking trail after last road crossing (near Tara's Track) | Variable | view | |||
Aug 3, 2025 @ 12:22am Aug 3, 2025 | mtb Fixed berm after tree damage. | Ideal | view | |||
Aug 2, 2025 @ 11:11pm Aug 2, 2025 | mtb Tree in first section cleared. Slight damage to berm highside needs repair, but rideable. | Ideal | view | |||
Aug 2, 2025 @ 10:35pm Aug 2, 2025 | mtb Running well!! Such a sick track. | Variable | view | |||
Aug 2, 2025 @ 10:34pm Aug 2, 2025 | mtb Pig damage in top section. Needs a shovel and rake to repair but still rideable. | Variable | view | |||
Aug 2, 2025 @ 10:33pm Aug 2, 2025 | mtb Cleared trees that had fallen across track. All clear as of today. | Variable | view | |||
Aug 2, 2025 @ 9:43pm Aug 2, 2025 | mtb Tree down just before first crossing from top of trail head | Variable | view | |||
Aug 1, 2025 @ 12:19am Aug 1, 2025 | mtb Slightly damp, but generally running well. | Variable | view | |||
Aug 1, 2025 @ 12:17am Aug 1, 2025 | mtb Pretty wet with puddles in spots, but not too slippery except in the slush. | Wet | view | |||
Jul 26, 2025 @ 7:31pm (Australia/Sydney) Jul 26, 2025 | mtb Repair pig damage. about 2/3ds up near road reporter | Variable | view | |||
Jul 13, 2025 @ 4:57am Jul 13, 2025 | mtb CLOSED Trail has been closed due to low use and to reduce maintenance requirements for the Orange Mountain Bike Club. Please visit Glenwood Forest Trails for more riding options, including Trail of Awesomeness, plenty of jumps and can also be shuttled! reporter | Unknown | view | |||
Jul 10, 2025 @ 4:02pm Jul 10, 2025 | mtb DWE, realignment of switchbacks top section of trail, 162 metres of new trail, 2 large switchbacks, berm , rock jumps, grade reversals , trail open, may be soft in wet conditions. | Unknown | view | |||
Jul 7, 2025 @ 2:25pm Jul 7, 2025 | mtb Top block raked thoroughly - top to the junction of O&U. 4.5 hours. | Ideal | view | |||
Jul 7, 2025 @ 3:13am Jul 7, 2025 | mtb chainsaw work , trees / stumps , repaired pig diggings, raked top section, | Unknown | view | |||
Jul 5, 2025 @ 6:22pm Jul 5, 2025 | mtb Built shortcut exit onto road. Fixed drainage in lower woops/jumps. | Ideal | view | |||
Jul 5, 2025 @ 5:28pm Jul 5, 2025 | mtb Raked trail and fixed up a few worn down features, repaired pig damage. | Ideal | view | |||
Jul 5, 2025 @ 2:49pm Jul 5, 2025 | mtb Removed Log that was breaking up. reporter | Ideal | view | |||
Jul 5, 2025 @ 2:43pm Jul 5, 2025 | mtb IMPROVED JUMPS improved the jumps towards the top the second block. fixed lip of jump and improved entry to give a better approach. also added more grade reversals to improve drainage. reporter | Ideal | view | |||
Jul 5, 2025 @ 9:28pm (Australia/Sydney) Jul 5, 2025 | mtb Pig Damage at about half way point. reporter | Unknown | view | |||
Jul 4, 2025 @ 8:35pm Jul 4, 2025 | mtb Built up a line jumps in bottom block reporter | Ideal | view | |||
Jun 28, 2025 @ 9:24pm Jun 28, 2025 | mtb Dry and running well. Recent trail work has fixed heaps of issues and smoothed it out a lot | Ideal | view | |||
Jun 28, 2025 @ 9:22pm Jun 28, 2025 | mtb Mostly dry with some damp spots, but not slippery | Variable | view | |||
Jun 28, 2025 @ 8:18pm Jun 28, 2025 | mtb CLOSED Closed trail due to little use and to reduce maintenance requirements on the club. Visit Glenwood Forest for more trails and more advanced options. reporter | Unknown | view | |||
Jun 28, 2025 @ 8:15pm Jun 28, 2025 | mtb CLOSED Closed trail due to little use and to reduce maintenance requirements on the club. Visit Glenwood Forest for more trails and more advanced options. reporter | Unknown | view | |||
Jun 28, 2025 @ 6:53pm Jun 28, 2025 | mtb CLOSED TRAIL closed trail due to low use and to reduce the maintenance requirements for Orange Mountain Bike Club. Please visit Glenwood Forest for more trails and advanced options. reporter | Unknown | view | |||
Jun 24, 2025 @ 5:46am Jun 24, 2025 | mtb Trail Maintenance Middle section. 10.5 hours, resurfacing, reshaping jumps , clearing overgrown vegetation, improving berms. reporter | Ideal | view | |||
Jun 24, 2025 @ 12:03am Jun 24, 2025 | mtb AUDIT 2025 LENGTH (m) 1400 START ELEVATION (m) 1188 END ELEVATION (m) 985 ELEVATION DIFFERENCE (m) -203 AVERAGE GRADIENT (%) -14.5 MAX GRADIENT (%) 41 TRAIL WIDTH (mm) 600 ± 300 TREAD SURFACE Variable and challenging LEVEL OF EXPOSURE Downward slopes of up to 50% MAX HEIGHT OF UNAVOIDABLE OBJECTS (mm) 500 JUMPS Avoidable or rollable jumps MOUNTAIN BIKE TRAIL RATING Difficult (Black) Notes: - Signs in place notifying of direction and rating. - Give Way signs before road crossings. - Rock drop preceding trail to act as skills filter. Maintenance Requirements: - Before the first road crossing, riders are shortcutting down the hill to the left. Visibility is poor taking this line risking a collision with vehicles. Need to place large immovable log here. - Jump, towards start of second block, needs the lip repaired. - In the second block, a section of trail could be improved by clearing the entry to an A-line with a rocky drop on the right, and extending the B-line on the left. This would give advantage for the more advanced line. - At the drop, towards the bottom of the second block, Drop sign should only show two arrows to indicate size. - Log towards the bottom is loose and needs to be secured. reporter | Ideal | view | |||
Jun 23, 2025 @ 11:36pm Jun 23, 2025 | mtb AUDIT 2025 LENGTH (m) 905 START ELEVATION (m) 1146 END ELEVATION (m) 982 ELEVATION DIFFERENCE (m) -164 AVERAGE GRADIENT (%) -18.1 MAX GRADIENT (%) 47 TRAIL WIDTH (mm) 600 ± 300 TREAD SURFACE Variable and challenging LEVEL OF EXPOSURE Downward slopes of up to 50% MAX HEIGHT OF UNAVOIDABLE OBJECTS (mm) 1000+ JUMPS Avoidable or rollable jumps MIN WIDTH OF UNAVOIDABLE BRIDGES (mm) NA MOUNTAIN BIKE TRAIL RATING Extreme (Double Black) Notes: - Signs in place notifying of direction and rating. - Give Way signs before road crossings. - The first road crossing has a steep unavoidable drop into it, however riders have a good line of site up it for any cars. Maintenance Requirements: - At the start of the trail the rock drop needs to be built back up on the right hand side to form a better trail filter. - Wooden retaining wall for corner is not allowed under Forestry guidelines. Replace with stone. reporter | Ideal | view | |||
Jun 13, 2025 @ 10:17pm Jun 13, 2025 | mtb tree to clear in top block. requires chainsaw or reticulating saw. reporter | Ideal | view | |||
Jun 13, 2025 @ 7:08pm Jun 13, 2025 | mtb CLOSED Closed track due to low use and to reduce clubs maintenance requirements. Advanced trails can be found down the road at Glenwood Forrest Trails. reporter | Unknown | view | |||
May 31, 2025 @ 4:26am May 31, 2025 | mtb Trail Works Modified last turn on track, to make easier/funner to take at speed. Closed table top leading to road junction. reporter | Ideal | view | |||
May 30, 2025 @ 3:25pm May 30, 2025 | mtb Trail Building Re-routed section in bottom block before the steep pinch in the rock garden. Turns to the left now to keep going downhill and maintain momentum. Approximately 50m reporter | Unknown | view | |||
May 26, 2025 @ 9:42am May 26, 2025 | mtb Pigs have destroyed a significant section after the first road crossing | Variable | view | |||
May 25, 2025 @ 3:37pm May 25, 2025 | mtb Trail Closures at Glenwood – Harvesting Operations Starting May 19. Forestry Corporation has confirmed that harvesting in the northern blocks of Glenwood State Forest will begin on Sunday, May 19. As a result: - The Bottom Trailhead (Boree & Cargo Rd) and lower sections of Trail of Awesomeness & Galinbundinya will be closed. - Access is still available from Mitchell’s Way. - Upper Galinbundinya and all downhill trails will still be open. Shuttle users can follow the same route used during the recent DH event. Operations are expected to last approximately 3 months, depending on weather conditions. Please respect signage and exclusion zones — these closures are for your safety. | Dry | view | |||
May 25, 2025 @ 3:37pm May 25, 2025 | mtb Trail Closures at Glenwood – Harvesting Operations Starting May 19. Forestry Corporation has confirmed that harvesting in the northern blocks of Glenwood State Forest will begin on Sunday, May 19. As a result: - The Bottom Trailhead (Boree & Cargo Rd) and lower sections of Trail of Awesomeness & Galinbundinya will be closed. - Access is still available from Mitchell’s Way. - Upper Galinbundinya and all downhill trails will still be open. Shuttle users can follow the same route used during the recent DH event. Operations are expected to last approximately 3 months, depending on weather conditions. Please respect signage and exclusion zones — these closures are for your safety. | Dry | view | |||
May 25, 2025 @ 3:26pm May 25, 2025 | mtb Trail Closures at Glenwood – Harvesting Operations Starting May 19. Forestry Corporation has confirmed that harvesting in the northern blocks of Glenwood State Forest will begin on Sunday, May 19. As a result: - The Bottom Trailhead (Boree & Cargo Rd) and lower sections of Trail of Awesomeness & Galinbundinya will be closed. - Access is still available from Mitchell’s Way. - Upper Galinbundinya and all downhill trails will still be open. Shuttle users can follow the same route used during the recent DH event. Operations are expected to last approximately 3 months, depending on weather conditions. Please respect signage and exclusion zones — these closures are for your safety. | Variable | view | |||
May 18, 2025 @ 2:36am May 18, 2025 | mtb Overgrown Vegetation Cleared by Aplin landscaping 5625m approximately reporter | Dry | view | |||
May 18, 2025 @ 1:20am May 18, 2025 | mtb Overgrown Vegetation Cleared by Aplin landscaping reporter | Variable | view | |||
May 2, 2025 @ 7:39pm May 2, 2025 | mtb Audit 2025 AVERAGE GRADIENT (%): -9.6 MAX GRADIENT (%): 30 TRAIL WIDTH (mm): 600 ± 300 TREAD SURFACE: Possible sections of rocky or loose tread LEVEL OF EXPOSURE: Downward slopes of up to 50% MAX HEIGHT OF UNAVOIDABLE OBJECTS (mm): 400 JUMPS: Avoidable or rollable jumps MIN WIDTH OF UNAVOIDABLE BRIDGES (mm): 600 TRAIL RATING: Intermediate (Blue) Maintenance Requirements: - direction signs with rating in place. - give way signs before road crossings. - some pig diggings on second block to clean up. - grade reversals are working well to shed water. -tree sticking into trail in middle block. Requires reticulating saw or chainsaw. -in bottom block, drainage needs to be opened up in dips to let water out. reporter | Dry | view | |||
Apr 20, 2025 @ 1:37pm Apr 20, 2025 | mtb Big gum Tree down on lower climb. Requires chainsaw | Variable | view | |||
Apr 19, 2025 @ 4:38pm Apr 19, 2025 | mtb great trail just too many table-tops in some sections which ruin the flow and slow you down too much. | Unknown | view | |||
Apr 19, 2025 @ 4:37pm Apr 19, 2025 | mtb Tree down across the trail towards the end before Onwards & Upwards. hard to get the bike through. | Unknown | view | |||
Apr 17, 2025 @ 7:08pm Apr 17, 2025 | mtb Trail now fully re-open after forestry activities. One log towards too requires chainsaw. reporter | Dry | view | |||
Apr 3, 2025 @ 6:19pm Apr 3, 2025 | mtb Clear from top to bottom. Will be overgrown soon if there is no maintenance. | Very Dry | view | |||
Apr 3, 2025 @ 6:16pm Apr 3, 2025 | mtb Top half is overgrown. Middle is severely damaged and most gap jumps are overgrown. Bottom is overgrown and damaged. Better off riding the other downhill trail. | Very Dry | view | |||
Apr 3, 2025 @ 6:14pm Apr 3, 2025 | mtb Still overgrown. | Very Dry | view | |||
Apr 2, 2025 @ 3:51am Apr 2, 2025 | mtb Temporary Closure – Gulinbundinya Trail The top section of Gulinbundinya Trail, along Boree Creek, is currently closed due to Forestry operations. Forestry is replanting trees using heavy machinery, so for your safety and to maintain the club's collaboration with Forestry, please avoid the area until further notice. Thank you for your cooperation! reporter | Variable | view | |||
Mar 30, 2025 @ 12:30am Mar 30, 2025 | mtb Cleared running well | Very Dry | view | |||
Mar 30, 2025 @ 12:30am Mar 30, 2025 | mtb Cleared running well | Very Dry | view | |||
Mar 30, 2025 @ 12:30am Mar 30, 2025 | mtb Cleared running well | Very Dry | view | |||
Mar 30, 2025 @ 12:30am Mar 30, 2025 | mtb Cleared running well | Very Dry | view | |||
Mar 30, 2025 @ 12:30am Mar 30, 2025 | mtb Cleared running well | Very Dry | view | |||
Mar 22, 2025 @ 9:31pm Mar 22, 2025 | mtb Tree Down towards top. reticulating or chainsaw required. reporter | Ideal | view | |||
Mar 22, 2025 @ 9:25pm Mar 22, 2025 | mtb Tree Down towards top. Requires chainsaw. reporter | Ideal | view | |||
Mar 7, 2025 @ 10:19pm Mar 7, 2025 | mtb Audit 2025 - steepest section: 30% - some parts come close to double black trail. But signs have been installed to confirm right path. -towards bottom, grade reversals need to be re-established in sections and drainage improved to prevent trail rutting. reporter | Dry | view | |||
Mar 7, 2025 @ 9:44pm Mar 7, 2025 | mtb AUDIT 2025 LENGTH (m): 2400 AVERAGE GRADIENT (%): -11 MAX GRADIENT (%): -30 TRAIL WIDTH (mm): 600 ± 300 TREAD SURFACE: Possible sections of rocky or loose tread LEVEL OF EXPOSURE EITHER SIDE OF TRAIL: Downward slopes of up to 50% MAX HEIGHT OF UNAVOIDABLE OBJECTS (mm): 350 JUMPS: Tabletop jumps to 1500mm high. Rollable double jumps and avoidable gap jumps MIN WIDTH OF UNAVOIDABLE BRIDGES (mm): NA TRAIL RATING: Intermediate (Blue) Maintenance Required: - s bends in top block, has been short cut making a difficult line. an easier option needs to be made for a blue trail. -a short cut has formed going straight across the first fire road. This needs to be closed and the dog leg re-established as per the traffic management plan, to force riders to properly check for traffic. -New trail works have been completed by DWE to in bottom block to fix issues from last audit. the steepness on some sections have been reduced, and table top jump with preceding sharp lh turn reshaped to ride more predictably. reporter | Unknown | view | |||
Mar 7, 2025 @ 8:57pm Mar 7, 2025 | mtb Tree Down requires chainsaw reporter | Dry | view | |||
Feb 15, 2025 @ 7:02pm Feb 15, 2025 | mtb ⚠️ caution ⚠️ tree down in last block. Need to stop to pass under. will require a chainsaw to clear. reporter | Ideal | view | |||
Feb 8, 2025 @ 9:50pm Feb 8, 2025 | mtb AUDIT 2025 LENGTH: 7400m AVERAGE GRADIENT: -5.7% MAX GRADIENT: 15% TRAIL WIDTH: 900 ± 300mm TREAD SURFACE: Mostly firm and stable LEVEL OF EXPOSURE: Downward slopes of up to 50% MAX HEIGHT OF UNAVOIDABLE OBJECTS: 100mm JUMPS: Tabletop jumps to 1500mm high. TRAIL RATING: Easy/Intermediate (green/blue) Maintenance Requirements second block: -widen and smooth 300m, -clear drainage x2 4th block -clear vegetation 6th block - clear branch 7th block -clear vegetation, mainly Biddy bush and tussock grass. it's blocking drainage and forcing people to ride a narrow line. 9th block - clear branches of pine tree that's fallen. bottom big pine block -clear drainage ×5 -at last big jump on a line, clean up the dip before jump and take off face. reporter | Variable | view | |||
Feb 3, 2025 @ 3:14pm Feb 3, 2025 | mtb Top Section. Excavator Required (contract work) about 300m of trail effected -Grass encroaching on trail in the exposed section, Clear grass, re-open drainage and restore to original width. -One 20m section, of trail has become eroded. Requires grade reversals to be restored, drainage re-opened and surface smoothed. reporter | Variable | view | |||
Feb 2, 2025 @ 10:54am Feb 2, 2025 | mtb | Very Dry | view | |||
Feb 2, 2025 @ 10:54am Feb 2, 2025 | mtb | Very Dry | view | |||
Feb 2, 2025 @ 10:54am Feb 2, 2025 | mtb | Very Dry | view | |||
Feb 2, 2025 @ 10:54am Feb 2, 2025 | mtb | Very Dry | view | |||
Feb 2, 2025 @ 2:14am Feb 2, 2025 | mtb Bottom of Bottom Block 500m Excavator Required. -Clear Blackberries and other scrub encroaching on corridor, restore to at least 3m wide. -Near final jumps, clear blackberries at sides of trail allowing space for spectators at Nationals. -Smooth trail surface, repairing sections that have become rutted with water. -Resurface the face of jumps, where one line is forming due to wear. -Increase the length of the pipe after the long channel. Riders have been clipping the header rocks on the left hand side, trying to get the right line for the next section. -Block the shortcut from the B line that re-joins just after the last gap jump. -Reshape the rollers after the last gap jump. reporter | Ideal | view | |||
Feb 2, 2025 @ 1:17am Feb 2, 2025 | mtb Top of Bottom Section 250m -Clear branches of trees and surrounding shrubs to open up the visibility of the area. -Fix first gap jump, sand bags are deteriorating. -Repair jumps towards the bottom as they're getting blown out. reporter | Dry | view | |||
Feb 1, 2025 @ 7:44pm Feb 1, 2025 | mtb Bottom of Mid Section excavator required - Clear Weeds on machine built section above road crossing. - Smooth rutted sections of trail in machine built section above road crossing. - Build up drop to act as better trail filter. reporter | Dry | view | |||
Feb 1, 2025 @ 7:35pm Feb 1, 2025 | mtb Mid Section -clear stumps reporter | Dry | view | |||
Feb 1, 2025 @ 7:26pm Feb 1, 2025 | mtb Bottom of Top Section -fix lip edge of lander on gap lander. Add extra soil so it ramps back, this will make it safer someone lands short. -add jump after gap jump. -before road crossing, fix the setup for the berm. You hit it a bit square at the moment, build up the entry on the right so people can start railing it earlier, or push back the middle of the berm. reporter | Dry | view | |||
Feb 1, 2025 @ 7:07pm Feb 1, 2025 | mtb Top Section -rake to widen , clear branch's below from line. 300m -build up for support before tree. -put in another line option, this will set riders up better for the next section. -clear dead tree after jump to open up landing. and build up after for catch support. -berm up turn after steep section for better support. reporter | Dry | view | |||
Feb 1, 2025 @ 6:48pm Feb 1, 2025 | mtb Not anymore a trail | Unknown | view | |||
Feb 1, 2025 @ 10:44am Feb 1, 2025 | mtb | Very Dry | view | |||
Feb 1, 2025 @ 10:44am Feb 1, 2025 | mtb | Very Dry | view | |||
Feb 1, 2025 @ 10:44am Feb 1, 2025 | mtb | Very Dry | view | |||
Feb 1, 2025 @ 10:44am Feb 1, 2025 | mtb | Very Dry | view | |||
Feb 1, 2025 @ 10:44am Feb 1, 2025 | mtb | Very Dry | view | |||
Jan 31, 2025 @ 2:44pm Jan 31, 2025 | mtb | Very Dry | view | |||
Jan 31, 2025 @ 2:44pm Jan 31, 2025 | mtb | Very Dry | view | |||
Jan 31, 2025 @ 2:44pm Jan 31, 2025 | mtb | Dry | view | |||
Jan 31, 2025 @ 2:44pm Jan 31, 2025 | mtb | Very Dry | view | |||
Jan 31, 2025 @ 2:44pm Jan 31, 2025 | mtb | Very Dry | view | |||
Jan 31, 2025 @ 2:44pm Jan 31, 2025 | mtb | Very Dry | view | |||
Jan 31, 2025 @ 2:44pm Jan 31, 2025 | mtb | Very Dry | view | |||
Jan 31, 2025 @ 2:44pm Jan 31, 2025 | mtb | Very Dry | view | |||
Jan 19, 2025 @ 5:38am Jan 19, 2025 | mtb As always plenty of potholes to watch out for | Dry | view | |||
Jan 18, 2025 @ 9:27pm Jan 18, 2025 | mtb Trees Down, cleared all of them with reticulating saw, except one which required chainsaw. All clear now. reporter | Variable | view | |||
Jan 18, 2025 @ 8:32pm Jan 18, 2025 | mtb Middle hand built section. Hand tools required due to access. -100m aprox of Rough eroded surface needs to be smoothed to meet green/Blue requirements. See photos. -Switchback too steep for intermediate riders. Re-shape, or go further along the hill to add another switchback where it should be easier to build. Aprox 900m up trail. see photo. -Steep section becoming very rough. Re-route to add more switchbacks. This will add length, reduce gradient which will make it easier to ride and reduce erosion. Aprox 1.18km up, Located towards the end of the hand built section through the steep and rocky side slope. -Switchback too steep for intermediate riders. Re-shape, move soil from upper section to lower section to reduce the height difference. Aprox 1.8km up. reporter | Variable | view | |||
Jan 18, 2025 @ 4:20pm Jan 18, 2025 | mtb Cleaned everything up after the storm and high winds. Trail is clear, swept and running fast, although pretty dry. | Dry | view | |||
Jan 18, 2025 @ 4:18pm Jan 18, 2025 | mtb Cleaned everything up after the storm and high winds. Everything is clear and running fast, although pretty dry. | Dry | view | |||
Jan 16, 2025 @ 11:43pm Jan 16, 2025 | mtb Trees down from the top road crossing to federal falls. I climbed over 5 trees before I couldn’t get past one just past the first bridge heading up. The fire trail to the right heading up also has endless trees down, I gave up trying to go further. Didnt try the fire trail to the left as a path to onwards and upwards. Forgot to take photos, but it will definitely need a fair bit of chainsaw work. Rest of galinbundinya has some minor sticks that I got sick of clearing but is otherwise running well | Dry | view | |||
Jan 11, 2025 @ 11:11am Jan 11, 2025 | mtb Running Well | Dry | view | |||
Jan 11, 2025 @ 11:11am Jan 11, 2025 | mtb Needs significant clearing, lots of sections overgrown with blackberries | Dry | view | |||
Jan 11, 2025 @ 11:11am Jan 11, 2025 | mtb Everything fine other than 6 large trees down on track | Dry | view | |||
Jan 11, 2025 @ 11:11am Jan 11, 2025 | mtb No longer exists due to logging | Dry | view | |||
Jan 11, 2025 @ 11:11am Jan 11, 2025 | mtb Needs a hedge trimmer and whipper snipper down the bottom | Dry | view | |||
Jan 11, 2025 @ 11:11am Jan 11, 2025 | mtb | Dry | view | |||
Jan 11, 2025 @ 11:11am Jan 11, 2025 | mtb | Dry | view | |||
Jan 10, 2025 @ 10:18pm Jan 10, 2025 | mtb First road crossing to Federal Falls end, restoration required 1600m aprox Excavator Required (contractor) - Grass is overgrowing sections, particularly where there's no tree cover. -Restore grade reversals, -Restore outside drains, -Re shape trail surface where 'cupping' has happened and restore out slope. -Widen back to 1.5m -Re Smooth trail surface. -See GPS files for sections attached, Gal Repair Sections 2025 reporter | Variable | view | |||
Jan 10, 2025 @ 9:32pm Jan 10, 2025 | mtb 50m of trail, Grass is overgrowing, restore grade reversals, restore outside drains, widen, re-smooth. reporter | Ideal | view | |||
Jan 10, 2025 @ 9:29pm Jan 10, 2025 | mtb 40m of trail, Grass is overgrowing, restore grade reversals, restore outside drains, widen, smooth trail surface. reporter | Ideal | view | |||
Jan 10, 2025 @ 9:18pm Jan 10, 2025 | mtb 240m of trail, out in open section. Grass is overgrowing, blocking drainage and tack is drying up and breaking. Consider re-routing, sticking closer to creek and under tree cover to protect trail. reporter | Ideal | view | |||
Jan 10, 2025 @ 9:11pm Jan 10, 2025 | mtb 200m of trail, Grass is overgrowing, restore grade reversals, restore outside drains, widen, re-smooth. reporter | Ideal | view | |||
Jan 10, 2025 @ 9:05pm Jan 10, 2025 | mtb 30m of trail, at switchbacks heading to creek require grade reversals to be re-established and track smoothed again. reporter | Ideal | view | |||
Jan 10, 2025 @ 8:18pm Jan 10, 2025 | mtb 100m of Trail, restore grade reversals on switchback away from creek. reporter | Ideal | view | |||
Jan 3, 2025 @ 11:57am Jan 3, 2025 | mtb Nice trail when shotgunning with a toddler. Only rode the first few KMs, fun for them on the way down. Found some blackberries growing onto the trail so did get a few thorns scratching at my arms | Ideal | view | |||
Jan 3, 2025 @ 9:34am Jan 3, 2025 | mtb Rode with 8 yr old daughter on a hardtail, we both had a blast! Thanks trail builders! | Variable | view | |||
Dec 23, 2024 @ 3:43am Dec 23, 2024 | mtb After some forestry operations in early July, the entire trail is now open for use, until at least 6th January 2025. With recent rain but warm conditions the trail surface is in good condition. Some areas have become eroded, maintenance work will be carried out to remedy these. reporter | Ideal | view | |||
Dec 15, 2024 @ 3:12pm Dec 15, 2024 | mtb Track was great fun but the blackberries are starting to try to take the track back in a few spots. | Variable | view | |||
Nov 13, 2024 @ 3:06pm Nov 13, 2024 | ebike | Variable | view | |||
Nov 13, 2024 @ 3:06pm Nov 13, 2024 | ebike | Variable | view | |||
Nov 4, 2024 @ 7:40pm Nov 4, 2024 | mtb Cleared and swept. Dry, but running fast. | Dry | view | |||
Oct 30, 2024 @ 9:39am Oct 30, 2024 | ebike | Very Dry | view | |||
Oct 30, 2024 @ 9:39am Oct 30, 2024 | ebike | Variable | view | |||
Oct 30, 2024 @ 9:39am Oct 30, 2024 | ebike A bit steep in some sections still on of my favourites | Very Dry | view | |||
Oct 30, 2024 @ 9:39am Oct 30, 2024 | ebike A bit chopped up, DH boys ripped it up a bit | Very Dry | view | |||
Oct 30, 2024 @ 9:39am Oct 30, 2024 | ebike Might need a clean up. Don’t thing this trail gets much action. | Ideal | view | |||
Oct 21, 2024 @ 8:47pm Oct 21, 2024 | mtb Spring growth so watch out for the nettles. Really lovely meandering climb. | Dry | view | |||
Oct 21, 2024 @ 8:45pm Oct 21, 2024 | mtb Running fast! | Ideal | view | |||
Sep 23, 2024 @ 11:03am Sep 23, 2024 | mtb | Ideal | view |
- previous page
Login to view work report summary


