- Trail:
- Atomic Dog (Galbraith)
- Status:
- Minor Issue / Yellow
-
Issue status:
- Condition:
- Prevalent Mud - trail use not recommended, trail damage likely
- Reporter Primary Activity:
- Mountain Bike
Description:
rebuilt the second half of a berm that was eroding and did a quick fix on a large hole that had appeared due to a spring.
There are areas just above the clear cut that are still in need of work (referenced in the last trail report on April 10th) and ideally the clear cut needs an excavator to do some touch ups on some areas.
There are areas just above the clear cut that are still in need of work (referenced in the last trail report on April 10th) and ideally the clear cut needs an excavator to do some touch ups on some areas.
- Work Report:
- trail work done
- 1 volunteer attendees
- 4 volunteer hours
- 1 total workers
- 4.0 total work hours
Individual Workers:
Local Weather During Report
- Summary
Clear - Temperature
23° (15°/26°) - Precip
0 mm/h - Wind
12.7 km/h - Cloud Cover
2% - Humidity
0.46