• Trail:
  • Velvet Grind (Pheasant Glen)
  • Status:
  • Minor Issue / Yellow
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Installed another 2x10 tributary crossing, mowed and dug the side hill traverse below hunters seat, cleared several bigger deadfall logs and prepped a cedar slab bridge feature (left to dry, still to heavy to move), mowed the terminus area up to and beyond Sitka log bridge, cleared and dug creek crossing, corduroy install over one drainage area (still needs a bit more work); after several mowing passes on the new bypass we placed tarp material pinned down over invasive weeds to be covered with gravel/soil;
  • Work Report:
  • trail work done

  • 2 volunteer attendees
  • 9 volunteer hours
  • 2 total workers
  • 9.0 total work hours
Individual Workers:
Kus
hours: 4.5
paid: no
Martin-01
hours: 4.5
paid: no

Local Weather During Report

  • Summary
    Drizzle
  • Temperature
    10° (5°/15°)
  • Precip
    0.32 mm/h
  • Wind
    4.19 km/h
  • Cloud Cover
    76%
  • Humidity
    0.7

Previous Reports

statusdatedescription
Feb 24, 2026 @ 9:47pm
Feb 24, 2026
The tree bridge to Charybdis is Gone. Like washed away gone gone. There is a new tree over the river close to the old crossing but the root ball... view
Feb 24, 2026 @ 9:42pm
Feb 24, 2026
Tree down on trail half way down. Needs a chain saw. And there is a bunch of dead fall at the bottom that needs to be cleaned out. view
Nov 18, 2025 @ 12:32pm
Nov 18, 2025
Deadfall cut, turned into border log, made a few more widening improvements on upper area, a support post is still needed under pickup sticks... view