Description:
Trail Trimming and removed swinging vines and overhanging growth.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 1 volunteer hours
  • 1 total workers
  • 1.0 total work hours
Individual Workers:
Nedermeyer
hours: 1
paid: no

Local Weather During Report

  • Summary
    MostlyClear
  • Temperature
    29° (20°/29°)
  • Precip
    0 mm/h
  • Wind
    8.32 km/h
  • Cloud Cover
    30%
  • Humidity
    0.47

Previous Reports

statusdatedescription
Sep 7, 2026 @ 11:27am
Sep 7, 2026
Removed obstructing deadfall on the whole main trail. Plus all the Loops from 1 through 5, David Overton Loop and Got 6 Minutes. Removed the... view
Aug 25, 2026 @ 1:03pm
Aug 25, 2026
Rode all but Wild Turkey 1 and 2 because of time constraints. Removed all large deadfall blocking trail. Removed downed tree on Loop 5. A lot of... view
Aug 21, 2026 @ 12:02pm
Aug 21, 2026
Put in new signage and closed the old entrance. view

0 Comments






Official Report

  • CLIMB Overton Admins
  • CLIMB-OV
  • 1
  • Share with followers