Description:
Weed whipped from the start down to the Weeper intersection and ran out of line.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 1 volunteer hours
  • 1 total workers
  • 1.0 total work hours
Individual Workers:
pcassingham (Pat Cassingham)
hours: 1
paid: no

Local Weather During Report

  • Summary
    PartlyCloudy
  • Temperature
    16° (16°/26°)
  • Precip
    0 mm/h
  • Wind
    6.81 km/h
  • Cloud Cover
    58%
  • Humidity
    0.96

Previous Reports

statusdatedescription
Aug 6, 2026 @ 12:35pm
4 hours
Freshly whipped and ready to rip. view
Jul 27, 2026 @ 7:16pm
Jul 27, 2026
Rode the weeper trail to the top of fractured Falls, and removed a few smaller sized branches that were laying on the trail. The top of the trail... view
Jul 7, 2026 @ 6:39am
Jul 7, 2026
Cleared branches from trail. Some sections will need weed whipping soon but it is not bad yet view

0 Comments






Official Trail Reporter i

  • IROC Redhead Trail Maintenance
  • IROC
  • 0
  • Share with followers