Description:
Weed whipped from the mailbox to the bottom of the climb. The climb itself still needs to be whipped
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 1 volunteer hours
  • 1 total workers
  • 1.0 total work hours
Individual Workers:
pcassingham (Pat Cassingham)
hours: 1
paid: no

Local Weather During Report

  • Summary
    PartlyCloudy
  • Temperature
    16° (16°/26°)
  • Precip
    0 mm/h
  • Wind
    6.81 km/h
  • Cloud Cover
    58%
  • Humidity
    0.96

Previous Reports

statusdatedescription
Jul 22, 2026 @ 8:35pm
3 hours
Trail is riding perfect. Lower section along the haul road to cross fire could use a weed trimming soon. view
Jul 22, 2026 @ 7:27am
16 hours
Weed whacked from wall to the ATV trail view
Jul 21, 2026 @ 6:32am
2 days
Weed whacked from trailhead to the wall. view

0 Comments






Official Trail Reporter i

  • IROC Redhead Trail Maintenance
  • IROC
  • 0
  • Share with followers