• Trail:
  • Don't Believe the Hype (Glenwood Forest Trails)
  • Status:
  • Minor Issue / Yellow
  • Issue status:
    Assigned user:
  • Condition:
  • Variable - some wet spots, or some dusty spots but overall good conditions
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Small trees over track at the start and a larger tree over the track about half way down needing a chainsaw.
This report was generated from the ridelog.

Local Weather During Report

  • Summary
    MostlyClear
  • Temperature
    (4°/12°)
  • Precip
    0 mm/h
  • Wind
    16.55 km/h
  • Cloud Cover
    37%
  • Humidity
    0.91

Previous Reports

statusdatedescription
May 31, 2026 @ 9:38pm
May 31, 2026
Pine straw removed and drains cleaned and minor erosion repairs first 2 sections view
May 10, 2026 @ 3:53am
May 10, 2026
Work on new B line to avoid techi Rocky section in middle. Aprox 100m built. view
Mar 31, 2026 @ 1:50am
Mar 31, 2026
Large tree over trail , just over first road crossing, removed with chain saw view

0 Comments






  • 0
  • Share with followers