Description:
trail closed due to underground construction. about 1.5km north of Rollyview Road and Blackgold Dr.

Local Weather During Report

  • Summary
    MostlyClear
  • Temperature
    7° (4°/18°)
  • Precip
    0.06 mm/h
  • Wind
    4.94 km/h
  • Cloud Cover
    25%
  • Humidity
    0.85

Previous Reports

statusdatedescription
Nov 6, 2026 @ 11:13am
2 days
multiway construction complete. Trail open. Upgraded to 3m paved trail from earlier 1.5m/2.0m width view
Apr 9, 2026 @ 11:52am
Apr 9, 2026
Uneven surface, gravel, sand, mud around new subdivision entrance at the middle point view
Apr 28, 2025 @ 3:02pm
Apr 28, 2025
view

0 Comments






  • 0
  • Share with followers