• Trail:
  • Strawberry Ridge (Goat Mountain)
  • Status:
  • Minor Issue / Yellow
  • Issue status:
    Assigned user:
  • Condition:
  • Variable - some wet spots, or some dusty spots but overall good conditions
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Rode from Green River Trail to North terminus 10/23. Trail is generally in good shape. No snow or trees down. Midway down the descent, there are substantial sections that have watercourse issues and drainage debris on the trail surface. All rideable, but makes it much rowdier at speed.

The bridge on FSR26 that others mentioned is almost done. It is located at 46.43077, -122.01464 on Crystal Creek. The bridge was in and crews were moving gravel and grading the transition. They let me through no problem on my bike, but you still cannot pass with a vehicle as of 10/23/25.

Local Weather During Report

  • Summary
    Cloudy
  • Temperature
    7° (6°/10°)
  • Precip
    0 mm/h
  • Wind
    14.56 km/h
  • Cloud Cover
    97%
  • Humidity
    0.89

Previous Reports

statusdatedescription
Sep 13, 2026 @ 8:06am
Sep 13, 2026
All clear! It’s fall up there view
Aug 2, 2026 @ 10:09am
Aug 2, 2026
All clear. view
Jul 26, 2026 @ 11:31am
Jul 26, 2026
99% clear. One tree down on the bottom half of strawberry ridge descent- easy to spot. There is another tree down on the gravel forest road at the... view

0 Comments






  • 0
  • Share with followers