Description:
Cleared one fallen tree on this track, there’s still a big log across it, but the bridge is solid and passable if you lift your bike onto the first section

Local Weather During Report

  • Summary
    MostlyCloudy
  • Temperature
    14° (14°/32°)
  • Precip
    0 mm/h
  • Wind
    14.91 km/h
  • Cloud Cover
    69%
  • Humidity
    0.7

Previous Reports

statusdatedescription
Mar 25, 2023 @ 11:26pm
Mar 25, 2023
Big tree makes riding down to the bridge impossible. Need to walk a couple of sections to get to the bridge. view
Jan 1, 2023 @ 8:33am
Jan 1, 2023
Fallen tree encroaching on the gully bridge, blocking both the upper and lower entrances to this trail from the upstream end. Significant... view

1 Comment

  • + 0
 Still some other fallen trees in places too, requiring walking around in a few sections, however got through successfully still





  • 0
  • Share with followers