- Trail:
- Goose Bumps (Pheasant Glen)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Ideal - Hero dirt! Not wet but not dry, moisture in soil.
- Reporter Primary Activity:
- Mountain Bike
Description:
Cut the large deadfall and removed a bunch of wild roses again blocking access, some leaning smaller trees are still to do right before the cedar arch bridge behind the chemical building.(my saw failed so couldn’t do those) Also wildlife spread a bag of garbage at the upper level 150m into the trail
- Work Report:
- trail work done
- 1 volunteer attendees
- 0.5 volunteer hours
- 1 total workers
- 0.5 total work hours
Individual Workers:
Kus
hours: 0.5
paid: no
Local Weather During Report
- Summary
PartlyCloudy - Temperature
1° (-0°/6°) - Precip
0 mm/h - Wind
1.85 km/h - Cloud Cover
52% - Humidity
0.93