• Trail:
  • Goose Bumps (Pheasant Glen)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Cut the large deadfall and removed a bunch of wild roses again blocking access, some leaning smaller trees are still to do right before the cedar arch bridge behind the chemical building.(my saw failed so couldn’t do those) Also wildlife spread a bag of garbage at the upper level 150m into the trail
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 0.5 volunteer hours
  • 1 total workers
  • 0.5 total work hours
Individual Workers:
Kus
hours: 0.5
paid: no

Local Weather During Report

  • Summary
    PartlyCloudy
  • Temperature
    (-0°/6°)
  • Precip
    0 mm/h
  • Wind
    1.85 km/h
  • Cloud Cover
    52%
  • Humidity
    0.93

Previous Reports

statusdatedescription
Jan 17, 2026 @ 9:21pm
Jan 17, 2026
Large 12-14” tree fir? down just past the access road crossing past the chemical building view
Oct 9, 2025 @ 6:33pm
Oct 9, 2025
Small tree down over the little bridge by the access rd. And another big one down just on the other side of the road. That one needs a chain saw. view
Nov 2, 2024 @ 2:22pm
Nov 2, 2024
Watch the bridge it is like ice; Moved two of the pipes, could only budge the big one a couple inches, needs two guys (or a crane) view

0 Comments






Official Report

  • Friends of Pheasant Glen Trails - Regional Admin Group
  • FOPG
  • 0
  • Share with followers