• Trail:
  • Blackmud multi (Central Edmonton (South))
  • Status:
  • Closed / Red
  • Issue status:
    Assigned user:
  • Condition:
  • Unknown - please contribute condition
  • Reporter Primary Activity:
  • Mountain Bike
Description:
LRT expansion line has the whole area changed. the train bridge being built will have new MUP to connect the side of blackmud creek but wont be done for a few years.

Local Weather During Report

  • Summary
    MostlyClear
  • Temperature
    -13° (-14°/4°)
  • Precip
    0 mm/h
  • Wind
    5.88 km/h
  • Cloud Cover
    36%
  • Humidity
    0.78

0 Comments






  • 0
  • Share with followers