• Trail:
  • Fingertips (Pemberton Mountain Bike Park)
  • Status:
  • Closed / Red
  • Issue status:
    Assigned user:
  • Condition:
  • Unknown - please contribute condition
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Fingertips has been rebuilt and extended. It is currenlty closed while a log bridge/rollover is constructed. A platform will also be built to cross the old trolley railway line that use to roll down to the Pemberton Pool.

Work is underway to cut access through the fallen Karri tree across the ride line.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 5 volunteer hours
  • 1 paid attendees
  • 5 paid hours
  • 2 total workers
  • 10.0 total work hours
Individual Workers:
Mhudo
hours: 5
paid: no
Peter Henley
hours: 5
paid: yes

Local Weather During Report

  • Summary
    MostlyClear
  • Temperature
    14° (13°/21°)
  • Precip
    0 mm/h
  • Wind
    11.69 km/h
  • Cloud Cover
    15%
  • Humidity
    0.89

Previous Reports

statusdatedescription
Jun 19, 2026 @ 3:28am
Jun 19, 2026
Fresh Trail Friday - Trail Blown Clear view
Jun 4, 2026 @ 8:59pm
Jun 4, 2026
Caution advised following major storm event. Trail condition currently unknown. view
Apr 7, 2026 @ 1:40am
Apr 7, 2026
Alternative entry off Woodcutters built whilst the ramp is under construction. view

0 Comments






Official Trail Reporter i

  • Pemberton Visitor Centre
  • PVC
  • 0
  • Share with followers