- Trail:
- Fingertips (Pemberton Mountain Bike Park)
- Status:
- Closed / Red
-
Issue status:
- Condition:
- Unknown - please contribute condition
- Reporter Primary Activity:
- Mountain Bike
Description:
Fingertips has been rebuilt and extended. It is currenlty closed while a log bridge/rollover is constructed. A platform will also be built to cross the old trolley railway line that use to roll down to the Pemberton Pool.
Work is underway to cut access through the fallen Karri tree across the ride line.
Work is underway to cut access through the fallen Karri tree across the ride line.
- Work Report:
- trail work done
- 1 volunteer attendees
- 5 volunteer hours
- 1 paid attendees
- 5 paid hours
- 2 total workers
- 10.0 total work hours
Individual Workers:
Mhudo
hours: 5
paid: no
Peter Henley
hours: 5
paid: yes
Local Weather During Report
- Summary
MostlyClear - Temperature
14° (13°/21°) - Precip
0 mm/h - Wind
11.69 km/h - Cloud Cover
15% - Humidity
0.89