• Trail:
  • Bush Creek (Arrowtown Trails)
  • Status:
  • Minor Issue / Yellow
  • Issue status:
    Assigned user:
  • Condition:
  • Variable - some wet spots, or some dusty spots but overall good conditions
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Bridge mesh needs replaced on 90 degree bridge directly above the dam. Also entrance needs rock armouring and filled with dirt to remove step up on to it

Local Weather During Report

  • Summary
    Cloudy
  • Temperature
    (3°/10°)
  • Precip
    0.45 mm/h
  • Wind
    7.3 km/h
  • Cloud Cover
    91%
  • Humidity
    0.83

Previous Reports

statusdatedescription
Sep 1, 2026 @ 8:36pm
Sep 1, 2026
Multiple slips (still moving), washouts and rockfall. Will need time to settle and clear once an excavator is established on site. Please avoid... view
Aug 28, 2026 @ 6:16pm
Aug 28, 2026
Major damage from recent flood event. Multiple slips, bridge footings undercut, washouts and fallen trees. Significant work required to re-instate... view
Aug 28, 2026 @ 2:14am
Aug 28, 2026
significant slip, will require immediate work. impassable by bike, dangerous on foot view

0 Comments






  • 0
  • Share with followers