• Trail:
  • Hub Return (Redhead Mountain Bike Park)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Inspected, cleared small downed branches and trees from storms on 6/29, repaired small divot on Hub Return, weed whipped
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 2.5 volunteer hours
  • 1 total workers
  • 2.5 total work hours
Individual Workers:
gneissrockcrawler
hours: 2.5
paid: no

Local Weather During Report

  • Summary
    Clear
  • Temperature
    15° (15°/28°)
  • Precip
    0 mm/h
  • Wind
    0.97 km/h
  • Cloud Cover
    10%
  • Humidity
    0.92

Previous Reports

statusdatedescription
Oct 24, 2026 @ 1:51pm
Oct 24, 2026
Blew the leaves off the trail this morning. The marginal rain made some hero dirt. Trail is riding fast! Have fun! view
Sep 11, 2026 @ 7:30pm
Sep 11, 2026
On 9/10 - rode a quick inspection view
Sep 7, 2026 @ 12:40pm
Sep 7, 2026
Whipped back and cleared small debris. Looking ideal with the rain having wet down the dust. Hero dirt view

0 Comments






  • 0
  • Share with followers