• Trail:
  • Mustang (Westpointe Ravine)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
The bridge at the end of Mustang is a bit flood, my buddies and I spent some time doing drainage work and cutting logs so we can ride over the mud and onto the structure, running good as of Aug 23, 2026. Further work needed like an extension over the muddy sections.
  • Work Report:
  • trail work done

  • 98 feet worked
  • 1 volunteer attendees
  • 2 volunteer hours
  • 1 total workers
  • 2.0 total work hours
Individual Workers:
Scona-Gabe (Gabe Fantino)
hours: 2
paid: no

Local Weather During Report

  • Summary
    Clear
  • Temperature
    15° (12°/28°)
  • Precip
    0 mm/h
  • Wind
    2.4 km/h
  • Cloud Cover
    2%
  • Humidity
    0.77