• Trail:
  • Loop 1 (Overton Preserve)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Unknown - please contribute condition
  • Reporter Primary Activity:
  • Mountain Bike
Description:
On Loop 1. Tree couldn’t be removed. It was very tangled up in the other tree and couldn’t be maneuvered out. Built up a log pile to stand on, cut and shortened the hanging portion enough so it didn’t interfere with riders. If it eventually rots and falls it should fall harmlessly away from the trail. Trimmed back the trail up to the rock pile.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 2 volunteer hours
  • 1 total workers
  • 2.0 total work hours
Individual Workers:
Nedermeyer
hours: 2
paid: no

Local Weather During Report

  • Summary
    Clear
  • Temperature
    23° (16°/25°)
  • Precip
    0 mm/h
  • Wind
    3.88 km/h
  • Cloud Cover
    4%
  • Humidity
    0.69

Previous Reports

statusdatedescription
Oct 2, 2026 @ 12:39pm
Oct 2, 2026
Walked entire trail and cleared all the deadfall from the storm. view
Sep 19, 2026 @ 12:34pm
Sep 19, 2026
Removed the sand at the start of the Rock Pile and opened up the drains. view
Sep 14, 2026 @ 4:22pm
Sep 14, 2026
Finished trimming by the Rock Pile. view

0 Comments






Official Report

  • CLIMB Overton Admins
  • CLIMB-OV
  • 0
  • Share with followers