• Trail:
  • Loop 1 (Overton Preserve)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Unknown - please contribute condition
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Removed the sand at the start of the Rock Pile and opened up the drains.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 1 volunteer hours
  • 1 total workers
  • 1.0 total work hours
Individual Workers:
Nedermeyer
hours: 1
paid: no

Local Weather During Report

  • Summary
    Drizzle
  • Temperature
    19° (15°/19°)
  • Precip
    0.13 mm/h
  • Wind
    4.75 km/h
  • Cloud Cover
    100%
  • Humidity
    0.9

Previous Reports

statusdatedescription
Sep 14, 2026 @ 4:22pm
Sep 14, 2026
Finished trimming by the Rock Pile. view
Aug 24, 2026 @ 1:46pm
Aug 24, 2026
On Loop 1. Tree couldn’t be removed. It was very tangled up in the other tree and couldn’t be maneuvered out. Built up a log pile to stand on,... view
Aug 23, 2026 @ 11:34am
Aug 23, 2026
Treet broke off and is just hanging above trail. potentially dangerous. view

0 Comments






Official Report

  • CLIMB Overton Admins
  • CLIMB-OV
  • 0
  • Share with followers