- Trail:
- Loop 1 (Overton Preserve)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Unknown - please contribute condition
- Reporter Primary Activity:
- Mountain Bike
Description:
Removed the sand at the start of the Rock Pile and opened up the drains.
- Work Report:
- trail work done
- 1 volunteer attendees
- 1 volunteer hours
- 1 total workers
- 1.0 total work hours
Individual Workers:
Local Weather During Report
- Summary
Drizzle - Temperature
19° (15°/19°) - Precip
0.13 mm/h - Wind
4.75 km/h - Cloud Cover
100% - Humidity
0.9
Previous Reports
Official Report
- CLIMB Overton Admins
- CLIMB-OV