- Trail:
- Construction Bypass (Don Valley)
- Status:
- Minor Issue / Yellow
-
Issue status:
- Condition:
- Dry -
- Reporter Primary Activity:
- Mountain Bike
Description:
At some point in the past couple weeks the contractor pushed the construction fencing back and downhill by about 8 or 10 feet, so it now slightly obstructs the final exit. Only about 20 feet of the trail is affected, it is an easy lift-over.
Local Weather During Report
- Summary
PartlyCloudy - Temperature
14° (11°/24°) - Precip
0 mm/h - Wind
4.92 km/h - Cloud Cover
62% - Humidity
0.78