• Trail:
  • Stink bats
  • Status:
  • Significant Issue / Amber
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Stink Bats is open to about halfway, you can travel from the Fairfield Boathouse/Pipe Bridge, all the way down to the Eastern Freeway. They are building a footbridge under the Freeway to cross the river there. So both sides of the river trails are blocked off by construction fences.

There is a foot trail that goes up from the trail closure up to Red Tag Casting Pool, and Fairlea Rd

Local Weather During Report

  • Summary
    Clear
  • Temperature
    12° (6°/18°)
  • Precip
    0 mm/h
  • Wind
    11.36 km/h
  • Cloud Cover
    0%
  • Humidity
    0.62

Previous Reports

statusdatedescription
Aug 20, 2026 @ 4:14pm
Aug 20, 2026
Closed at the works for the freeway or something. view
Jun 4, 2021 @ 6:44pm
Jun 4, 2021
view

0 Comments






Official Report

  • Inverell MTB Club - Regional Admin Group
  • IMTBC
  • 0
  • Share with followers