• Trail:
  • Skills Loop (Pemberton Mountain Bike Park)
  • Status:
  • Minor Issue / Yellow
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
The replacement of the the two wooden (black wattle) bridges on the Sills Loop is underway.
Sleepers have been installed on both bridges, with the first bridge completed.
The second longer bridge rock armouring is underway.
  • Work Report:
  • trail work done

  • 2 volunteer attendees
  • 12 volunteer hours
  • 2 total workers
  • 12.0 total work hours
Individual Workers:
Mhudo
hours: 6
paid: no
anonymous
hours: 6
paid: no

Previous Reports

statusdatedescription
Jun 4, 2026 @ 8:59pm
Jun 4, 2026
Caution advised following major storm event. Trail condition currently unknown. view
Apr 7, 2026 @ 1:37am
Apr 7, 2026
Trail raked clean of sticks, leaves and branches. view
Mar 31, 2026 @ 6:09pm
Mar 31, 2026
Trail cleared view

0 Comments






Official Trail Reporter i

  • Pemberton Visitor Centre
  • PVC
  • 0
  • Share with followers