More Filters
datedescriptioncondition
Nov 24, 2025 @ 7:00pm (America/Vancouver)
Nov 24, 2025
mtb reporter Variableview
Nov 10, 2025 @ 2:35pm (America/Vancouver)
Nov 10, 2025
mtb Closed due to logging until Nov 15, 2025 Unknownview
Oct 19, 2025 @ 9:22pm (America/Vancouver)
Oct 19, 2025
mtb Chartwell Resource Group is reactivating Access 3 to pull timber out of the Kwantlen WL0086, and thus the exit of Giant Killer, Lower Toadstool, B-line etc. will be impacted, and hauling will be ongoing afterwards. Trails will reopen once road building is completed (not a long term closure by any means) reporter Idealview
Feb 4, 2025 @ 4:36pm
Feb 4, 2025
mtb reporter Snow Coveredview
Nov 12, 2024 @ 7:35pm
Nov 12, 2024
mtb Tree has been removed Variableview
Nov 5, 2024 @ 5:05pm
Nov 5, 2024
mtb down tree Wetview
Jun 26, 2024 @ 2:34pm
Jun 26, 2024
mtb Trail raked out and trimmed the exit, running great Idealview
Mar 8, 2024 @ 10:42pm
Mar 8, 2024
mtb Wet but rideable Variableview
Feb 29, 2024 @ 6:31pm
Feb 29, 2024
mtb Trail raked out and most of the drains cleared. Variableview
Oct 31, 2023 @ 5:16pm
Oct 31, 2023
mtb Fallen trees removed, trail has been raked out. Used one of the fallen trees to make a small booter near the end of the trail to add some spice. Variableview
Oct 6, 2023 @ 10:28am
Oct 6, 2023
mtb Idealview
Jul 4, 2023 @ 8:10pm
Jul 4, 2023
mtb Trimmed the bottom
reporter
Dryview
Jan 11, 2023 @ 3:18pm
Jan 11, 2023
mtb Built a ride around the wet section before the flat log ride, repairing some of the eroded sections Variableview
Jan 3, 2023 @ 5:03pm
Jan 3, 2023
mtb Raked out trail, opened drains, running great Variableview
May 13, 2022 @ 7:18am
May 13, 2022
mtb Idealview
Feb 7, 2022 @ 9:05pm
Feb 7, 2022
mtb Removed fallen tree, cleared out a few drains and raked trail, running great Variableview
Nov 17, 2021 @ 11:59pm
Nov 17, 2021
mtb Cleared a few small trees, otherwise clear top to bottom. Loose gravel conditions. Variableview
Sep 19, 2021 @ 12:30pm
Sep 19, 2021
trailrun Tree cleared Wetview
Sep 10, 2021 @ 1:04pm
Sep 10, 2021
mtb Tree down through corner. Just needs a hands away as only about 5 inches thick. Idealview
Aug 20, 2021 @ 7:01pm
Aug 20, 2021
mtb Thanks to the recent rains and cooler temperature, fire risk has dropped and trails are now all open! Dryview
Jul 28, 2021 @ 7:50am
Jul 28, 2021
mtb Effective Wednesday, July 28th, 2021, the BCIT Forest Society which holds the forestry license for Woodlot 0007 requests that all riding within the Woodlot cease until fire hazard decreases and we receive rain. Very Dryview
Apr 4, 2021 @ 2:27pm
Apr 4, 2021
mtb Tree cleared Wetview
Apr 1, 2021 @ 12:49pm
Apr 1, 2021
mtb Tree down about 1/3 from top. Blocks trail completely. Rest of trail in great shape. Variableview
Jun 23, 2020 @ 1:29pm
Jun 23, 2020
mtb reporter Variableview
Jun 21, 2020 @ 4:58pm
Jun 21, 2020
mtb Trees Cleared. added a few grooves to that slippery log Variableview

Login to view work report summary