more stats
443 ft
Distance
11 ft
Climb
00:00:30
Avg time
13 ft
Altitude change
490 ft
Altitude min
503 ft
Altitude max
490 ft
Altitude start
502 ft
Altitude end
3%
Grade
6.6%
Grade min
223 ft
Distance climb
174 ft
Distance flat
00:00:30
Avg time

Construction trail Details

  • Activities
    • Mountain Bike
    • Winter Fat Bike
    • Horse
    • Hike
    • Trail Running
    • Snowshoe
    • Nordic Ski
  • Riding Area
    Hodges Village Dam
    Oxford, Massachusetts
  • Difficulty Rating
  • Local Popularity
    100 in Mountain Biking [+]
    • 95 in Trail Running
    • 100 in Hiking
    • 100 in Horseback
    • 5 in Snowshoeing
    • 5 in Nordic Skiing
  • Global Ranking
    #113999 in Mountain Biking [+]
    • #73234 in Trail Running
    • #23176 in Hiking
    • #114 in Horseback
    • #521 in Snowshoeing
  • Trail Type
    Singletrack
  • Bike Type
    AM, XC, Fat
  • Direction
    Both Directions[+]
    • Both Directions for Winter Fat Biking
  • Physical Rating
    Easy
  • Dogs Allowed
    Yes
  • eBike Allowed
  • Land Owner
    US Army Corps of Engineers

No community description for Construction trail trail has been added yet!

AI Generated Description

Construction trail is a 443 ft popular green difficulty singletrack trail located near Oxford Massachusetts. This multi-use trail can be used both directions and has a easy overall physical rating. On average it takes minutes to complete this trail.

Local Trail Association
Traditionally Indigenous Territory

Recent Activity on Trail

Past Week
  • 9 rides
  • 9 miles average
6 Months
  • 125 rides
  • 9 miles avg distance
All
  • 1,504 rides
  • Last: Aug 11, 2026
c1c2c3c4
January
February
March
April
May
June
July
August
September
October
November
December
update trails status or condition

Construction trail Trail Reports

Status:
on May 10, 2026
Ideal
no votes yet
Your vote: 0

view (3,647)
close
3D
Trail Conditions
  • Unknown
  • Snow Groomed
  • Snow Packed
  • Snow Covered
  • Snow Cover Partial
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Ideal
  • Dry
  • Very Dry
Trail Flow (Ridden Direction)
Trailforks scans users activity logs to determine the most popular direction each trail is ridden. A good flowing trail network will have most trails flowing in a single direction according to their intension.
The colour categories are based on what percentage of users are riding a trail in its intended direction.
  • > 96%
  • > 90%
  • > 80%
  • > 70%
  • > 50%
  • < 50%
  • bi-directional trail
  • no data
Trail Last Ridden
Trailforks scans activity logs to determine the last time a trail was ridden.
  • < 2 days
  • < 1 week
  • < 2 weeks
  • < 1 month
  • < 6 months
  • > 6 months
Trail Ridden Direction
The intended direction a trail should be ridden.
  • Downhill Only
  • Downhill Primary
  • Both Directions
  • Uphill Primary
  • Uphill Only
  • One Direction
Contribute Details
Colors indicate trail is missing specified detail.
  • Description
  • Photos
  • Description & Photos
  • Videos
Trail Popularity ?
Trailforks scans activity logs to determine which trails are ridden the most in the last 9 months. Trails are compared with nearby trails in the same city region with a possible 25 colour shades. Think of this as a heatmap, more activities = more kinetic energy = warmer colors.
  • most popular
  • popular
  • less popular
  • not popular
ATV/ORV/OHV Filter
Max Vehicle Width
inches
US Cell Coverage
Legend
cell carrier legend

Radar Time
Activity Recordings
Trailforks uses anonymized public activity data. ?
Activity Recordings
Trailforks uses anonymized public activity data. ?
Personal Heatmap
Activity Types
all / none
Options
2
Date range month
Winter Trails
Warning A routing network for winter maps does not exist. Selecting trails using the winter trails layer has been disabled.
Missing Trails
Most Popular
Least Popular
Trails are colored based on popularity. The more popular a trail is, the more red. Less popular trails trend towards green.
Jump Magnitude Heatmap
Heatmap of where users jump on trails. Zoom in to see individual jumps, click circles to view jump details.
BC Backroad Status

Service Road Atlas is a free to use, community-driven service for viewing and creating reports on the numerous back-country service roads around B.C. and Alberta.

map legend
Slope Aspect
Direction the slope faces
Flat N NE E SE S SW W NW
Trails Deemphasized
Trails are shown in grey.
disable
Only show trails with no bike usage.
Enable
Suggested Layers
Based on selected activity type

    Save the current map location and zoom level as your default home location whenever this page is loaded.

    Save
        Directions to construction-trail trailhead (42.122920, -71.877450)

        Photos

        No photos have been added for Construction trail yet, add a photo.

        Videos

        no videos have been added for Construction trail yet, add a video.

        Routes with this trail

        10 miles 726 ft 16 Out & Back
        Saturday 8/27 NEMBA ride.
        8 miles 334 ft 12
        BSTRA National Trails Day Route
        4 miles 131 ft 17 Loop
        My first attempt at an easy Hodges run.

        Reviews / Comments

        No reviews yet, be the first to write a review or ask a question.
        Use trail reports to comment on trail conditions.


        We hope you've been enjoying Trailforks!

        Create a FREE account to view trail comments and much more.

        • By Lpetsching BVNEMBA HVD & contributors
        • #138382 - 641 views

        Frequently Asked Questions About Construction trail

        Where is Construction trail located?
        Construction trail is located in Hodges Village Dam, Oxford, Massachusetts, United States. It is part of the Hodges Village Dam trail network. The trailhead is located at coordinates 42.12292, -71.87745.
        How hard is Construction trail?
        Construction trail is rated as Green difficulty. The physical rating is Easy. The average grade is 3%.
        What is the elevation gain for Construction trail?
        Construction trail has 11 ft of elevation gain. The elevation ranges from 490 ft to 503 ft.
        Is Construction trail a point to point trail?
        Construction trail is not a point to point trail. The direction is Both Directions. The trail type is singletrack.
        How long is Construction trail?
        Construction trail is 443 ft long. The trail type is singletrack.
        Are dogs allowed on Construction trail?
        Yes, dogs are allowed on Construction trail. Please keep dogs on a leash where required and clean up after them.
        When is the best time of year to ride Construction trail?
        Based on activity log data, the most popular months to ride Construction trail are:
        • July (175 activities)
        • August (127 activities)
        • May (101 activities)
        Check the reports page for current trail conditions.
        How do I access Construction trail? Where is the closest parking trailhead?
        The closest parking and trailhead locations to Construction trail are: View all parking locations in the area.
        How long does it take to ride Construction trail?
        Based on recorded activities, it takes an average of 1 minute to ride Construction trail. The trail is 443 ft long. Actual times will vary based on fitness level, conditions, and pace. View recent activity logs for more details.
        How busy is Construction trail?
        Construction trail is a very popular trail. There have been 2,781 recorded activities on this trail. The trail has received 3,629 check-ins. View recent activity on this trail.

        Hit the Trail

        Open in App

        Get this trail on your phone instantly.
        open trail in app

        Download Trail

        Save to wishlist, Garmin & download.
        save the trail

        Find Related Routes

        Find routes and users activities that include this trail.
        find routes for this trail

        You must enter a description before submitting.