more stats
1.2 miles
Distance
-1,827 ft
Descent
00:06:31
Avg time
-1,827 ft
Altitude change
5,456 ft
Altitude min
7,283 ft
Altitude max
7,283 ft
Altitude start
5,456 ft
Altitude end
-28.6%
Grade
-197%
Grade max
-10.7%
Grade min
1 mile
Distance down
00:06:31
Avg time

Critical Path Details

  • Activities
    • Downhill Ski
  • Riding Area
    Revelstoke Mountain Resort
    Revelstoke, British Columbia
  • Difficulty Rating
  • Local Popularity
    100 in Skiing
  • Global Ranking
    #559 in Skiing
  • Winter only trail
  • Trail Type
    Ski Run (Piste)
  • Direction
    Downhill Only
  • OSM Way

No community description for Critical Path trail has been added yet!

AI Generated Description

Critical Path is a 2 km blue difficulty ski run (piste) trail located near Revelstoke British Columbia. This downhill ski only trail. On average it takes 6 minutes to complete this trail.

Bike Park

Recent Activity on Trail

Past Week
  • 0 rides
  •  
6 Months
  • 197 rides
  • 32 miles avg distance
All
  • 544 rides
  •  
c1c2c3c4
January
February
March
April
May
June
July
August
September
October
November
December
update trails status or condition

Critical Path Trail Reports

no reports have been added for Critical Path yet, add a trail report.
Trail reports are used to indicate a trails current condition and inform builders and other riders about any issues on a trail.
Status:
Avg: 4.5 (2 votes)
Your vote: 0

view (5,891)
close
3D
Trail Conditions
  • Unknown
  • Snow Groomed
  • Snow Packed
  • Snow Covered
  • Snow Cover Partial
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Ideal
  • Dry
  • Very Dry
Trail Flow (Ridden Direction)
Trailforks scans users ridelogs to determine the most popular direction each trail is ridden. A good flowing trail network will have most trails flowing in a single direction according to their intension.
The colour categories are based on what percentage of riders are riding a trail in its intended direction.
  • > 96%
  • > 90%
  • > 80%
  • > 70%
  • > 50%
  • < 50%
  • bi-directional trail
  • no data
Trail Last Ridden
Trailforks scans ridelogs to determine the last time a trail was ridden.
  • < 2 days
  • < 1 week
  • < 2 weeks
  • < 1 month
  • < 6 months
  • > 6 months
Trail Ridden Direction
The intended direction a trail should be ridden.
  • Downhill Only
  • Downhill Primary
  • Both Directions
  • Uphill Primary
  • Uphill Only
  • One Direction
Contribute Details
Colors indicate trail is missing specified detail.
  • Description
  • Photos
  • Description & Photos
  • Videos
Trail Popularity ?
Trailforks scans ridelogs to determine which trails are ridden the most in the last 9 months. Trails are compared with nearby trails in the same city region with a possible 25 colour shades. Think of this as a heatmap, more rides = more kinetic energy = warmer colors.
  • most popular
  • popular
  • less popular
  • not popular
ATV/ORV/OHV Filter
Max Vehicle Width
inches
US Cell Coverage
Legend
cell carrier legend

Radar Time
Activity Recordings
Trailforks uses anonymized public activity data. ?
Activity Recordings
Trailforks uses anonymized public activity data. ?
Personal Heatmap
Activity Types
all / none
Options
2
Date range month
Winter Trails
Warning A routing network for winter maps does not exist. Selecting trails using the winter trails layer has been disabled.
Missing Trails
Most Popular
Least Popular
Trails are colored based on popularity. The more popular a trail is, the more red. Less popular trails trend towards green.
Jump Magnitude Heatmap
Heatmap of where riders jump on trails. Zoom in to see individual jumps, click circles to view jump details.
BC Backroad Status

Service Road Atlas is a free to use, community-driven service for viewing and creating reports on the numerous back-country service roads around B.C. and Alberta.

map legend
Slope Aspect
Direction the slope faces
Flat N NE E SE S SW W NW
Trails Deemphasized
Trails are shown in grey.
disable
Only show trails with no bike usage.
Enable
Suggested Layers
Based on selected activity type

    Save the current map location and zoom level as your default home location whenever this page is loaded.

    Save
        Directions to critical-path trailhead (50.962997, -118.102157)

        Photos

        No photos have been added for Critical Path yet, add a photo.

        Videos

        no videos have been added for Critical Path yet, add a video.

        Reviews / Comments

        No reviews yet, be the first to write a review or ask a question.
        Use trail reports to comment on trail conditions.


        We hope you've been enjoying Trailforks!

        Create a FREE account to view trail comments and much more.

        • By canadakaTF Pro Trailforks & contributors
        • #354477 - 1,169 views
        This trails GPS track was originally sourced from OpenStreetMap and will always be available for download in OSM Format.

        Frequently Asked Questions About Critical Path

        Where is Critical Path located?
        Critical Path is located in Revelstoke Mountain Resort, Revelstoke, British Columbia, Canada. It is part of the Revelstoke Mountain Resort trail network. The trailhead is located at coordinates 50.963, -118.10216.
        How hard is Critical Path?
        Critical Path is rated as Blue difficulty. The average grade is 28.6%.
        What is the elevation gain for Critical Path?
        The trail has 1,827 ft of elevation descent. The elevation ranges from 5,456 ft to 7,283 ft.
        Is Critical Path a point to point trail?
        Yes, Critical Path is a point to point trail. The direction is Downhill Only. The trail type is ski run (piste).

        Hit the Trail

        Open in App

        Get this trail on your phone instantly.
        open trail in app

        Download Trail

        Save to wishlist, Garmin & download.
        save the trail

        Find Related Routes

        Find routes and users activities that include this trail.
        find routes for this trail

        You must enter a description before submitting.