More Filters
datedescriptioncondition
Jun 19, 2026 @ 9:33am (America/Los_Angeles)
Jun 19, 2026
mtb Saw some youngins rebuilding the step up. Looks like it's good to go. Idealview
Jun 7, 2026 @ 4:28pm (America/Los_Angeles)
Jun 7, 2026
mtb Rebuilt everything and made some new trails Idealview
Aug 13, 2024 @ 11:07am
Aug 13, 2024
mtb Construction killed the trail. Variableview
Mar 16, 2024 @ 4:00pm
Mar 16, 2024
mtb Construction came through, looks like they're getting ready to bring a road in and develop the area. they plowed right through the middle of several trails and cut a ditch in the face of the step up. Variableview
Mar 17, 2021 @ 3:25pm
Mar 17, 2021
mtb Dryview
Aug 7, 2020 @ 12:36pm
Aug 7, 2020
mtb Step up is very soft - looks like someone tried to work with dry dirt recently. A little overgrown, but rideable Dryview
Jul 5, 2020 @ 1:15pm
Jul 5, 2020
mtb I walked most of this trail system today and it was pretty overgrown in parts and the features need some work. This could be a great neighborhood trail system with some repairs, upkeep and signage to de-conflict MTBers and walkers. Dryview
Mar 5, 2020 @ 2:06pm
Mar 5, 2020
mtb Short but pretty fun Wetview
Jan 20, 2020 @ 9:28pm
Jan 20, 2020
mtb Trail renovated. Don't ride, features are still soft Wetview
Nov 26, 2019 @ 10:53pm
Nov 26, 2019
mtb Touched up the bottom jump and began work on both drops but rest of trail is unrideable still Wetview
Nov 25, 2019 @ 10:59am
Nov 25, 2019
mtb Trail needs to be reworked after years of rains have left it to rot. All features are unrideable. Prevalent Mudview

Login to view work report summary