Sep 3, 2026 @ 6:07pm (America/Toronto)
Sep 3, 2026
ebike reporter Idealview
Jul 8, 2026 @ 8:03am (America/Toronto)
Jul 8, 2026
mtb reporter Very Dryview
Apr 22, 2026 @ 5:59pm (America/Toronto)
Apr 22, 2026
mtb i put two more water drain pipes in the small stone bridge on interface or hillbilly 2 or whatever its called because u guys keep changing the names of the trails or whatever and i patched in all the holes to make both bridges neat and smooth. thank you to the people actually organizing trail work and checking for damage and a big F-U to whoevers already doing dozens of laps on hillbilly before it has a chance to dry up after the worst spring flooding the city has had in years. Wetview
Jun 25, 2025 @ 5:47pm
Jun 25, 2025
mtb unclogged the drain pipe on this rock bridge and piled a bunch of fresh sandy soil on top with some support stones under and on the sides. this rock bridge was basically collapsing.
the second rock bridge that is closer to the sidewinder intersection is more of a challenge because i cannot seem to find any drain pipes so i just piled stones and new dirt on it. if anyone knows if there is a drain pipe for the other one then i might try to dig to unclog it.
Variableview
Jun 23, 2025 @ 5:12pm
Jun 23, 2025
mtb i made a berm/ dam/ jump here that should send water from rain storms on interface and 'trail' away from tongue's out down hill and instead to the river creek next to tongue's out. it is stones and branches buried in sand and soil. please do not remove this trail feature. the rain storms this week did significant erosion to the final section of tongue's out and the trail network entrance. Variableview
Oct 9, 2021 @ 10:30am
Oct 9, 2021
mtb Variableview
Jul 14, 2021 @ 9:04am
Jul 14, 2021
mtb All good. Idealview
May 23, 2021 @ 12:26pm
May 23, 2021
mtb Dry but that is normal for this time of year. Running well. Dryview