More Filters
datedescriptioncondition
Oct 15, 2026 @ 2:45pm (America/New_York)
Oct 15, 2026
mtb Part of trail closed near trail head due to construction. There are other places to access the trail. Unknownview
Aug 19, 2025 @ 4:39am
Aug 19, 2025
mtb Well… I never did find much of the actual bike trails… signage is poor / missing / non existent. I located one sign that indicated a T/TH/S direction… but I was there on a M with no discernible trail in the opposite direction? The very short flow trail was well done, but what little else I rode was off camber, rocky/rooty, and doesn’t appear to be ridden much. I think this is probably an excellent hiking trail. I should probably try again? Dryview
Sep 11, 2023 @ 3:13pm
Sep 11, 2023
mtb Parts of Pine Pong and Rocks of Doom trails are blocked off by construction fencing. Dryview
Nov 9, 2020 @ 1:55pm
Nov 9, 2020
mtb Idealview
May 29, 2020 @ 9:55am
May 29, 2020
mtb Minor Water drainage issue, standing water on trail surface Prevalent Mudview
Oct 5, 2019 @ 7:27am
Oct 5, 2019
mtb Dryview
May 28, 2018 @ 7:23am
May 28, 2018
mtb Unknownview

Login to view work report summary