• Trail:
  • Boogieman (Mount Seymour)
  • Status:
  • Minor Issue / Yellow
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
The right hand turn after the armoured roll down, in the final section before the log ride over the swamp, is slumping/broken. Not really a safety issue but will degrade more as people jam their brakes into it.

Previous Reports

statusdatedescription
Aug 16, 2026 @ 1:39pm
Aug 16, 2026
view
Jul 31, 2026 @ 4:24pm
Jul 31, 2026
Teetering on the edge of dry but ideal for the trail. view
Jun 7, 2026 @ 5:30pm
Jun 7, 2026
trail work upper trail. replaced broken support under bridge on zen bridge. raked rocks off upper trail. repaired riding surface of canoe log.... view

1 Comment

  • + 2
 Thanks for the report! I'll work on a solution for this section. That bomb hole after the rocks has always been an issue related to the design of that feature. It tends to pop up every year, so a longer term solution would be nice so we can focus on building new things.





  • 0
  • Share with followers