Description:
Bottom of Mid Section
excavator required

- Clear Weeds on machine built section above road crossing.
- Smooth rutted sections of trail in machine built section above road crossing.
- Build up drop to act as better trail filter.
  • Work Report:
  • trail work done

  • 230 feet worked
  • 1 paid attendees
  • 8 paid hours
  • 1 total workers
  • 8.0 total work hours
Individual Workers:
DWE
hours: 8
paid: yes

Local Weather During Report

  • Summary
    Clear
  • Temperature
    27° (14°/29°)
  • Precip
    0 mm/h
  • Wind
    7.25 km/h
  • Cloud Cover
    2%
  • Humidity
    0.38

Previous Reports

statusdatedescription
Aug 1, 2026 @ 9:32pm
Aug 1, 2026
Repair Gap Jump At bottom of second block it appears pigs 🐖 have been digging in the middle of the gap jump. This risks undermining the jump... view
Aug 1, 2026 @ 9:28pm
Aug 1, 2026
STOP SHORTCUTTING END! Large log required at end of trail to prevent people shortcutting to fire trail. Shortcut has a steep drop onto a... view
Aug 1, 2026 @ 9:21pm
Aug 1, 2026
TRAIL AUDIT 2026 - Direction and rating signs in place at entries. - Trail Filter, (skill check), in place at entries. - Gap jumps in place... view

0 Comments






Official Trail Reporter i

  • Orange Mountain Bike Club - Admin Group
  • OMC
  • 0
  • Share with followers